---
name: pto-calculation-rules-assistant
description: Specialized assistant for understanding and implementing PTO calculation rules, business logic, and accrual formulas in the DWP Hours Tracker.
title: pto-calculation-rules-assistant
canonical_url: https://skilld.dev/gh/corey-alix/dwp-hours/pto-calculation-rules-assistant
last_updated: 2026-10-07T01:30:59.000Z
---

> Index of every page on this site: [llms.txt](https://skilld.dev/llms.txt)

> **Skill from skilld.dev.** Follow the user's requested action.
> If the user asked to fork this Skill, follow the fork workflow below. Do not execute the Skill instructions while copying it.
> Otherwise, follow the instructions below for this session. You do not need to install anything.
>
> If the user asked to install this Skill, run `npx skilld install corey-alix/dwp-hours/pto-calculation-rules-assistant`. Install writes the Skill files into the project, so every session loads them.
>
> ## Fork workflow
>
> A fork creates an editable local Skill with its original author and licence. The request authorizes copying and local installation.
> 1. Check `./skills/pto-calculation-rules-assistant`, the project lockfile, and selected Agent targets together. If the local directory or installed Skill exists, stop. Never overwrite an existing directory or Agent target.
> 2. Read [source metadata](https://skilld.dev/api/v1/skills/corey-alix/dwp-hours/pto-calculation-rules-assistant) once. Use sourceUrl, sourceCommit, skillPath, sourceGone, and license. If the source is gone or its path is missing, stop. If license is null, read licence files at the source commit.
> 3. Fetch only the source commit into a temporary Git repository. Do not clone full history. Derive repository_url from sourceUrl, including repository renames. If sourceCommit is absent, resolve the sourceUrl ref once. Set source_commit to that actual commit. Run these commands in one shell call:
>
> ```sh
> git init --quiet "$temporary_dir"
> git -C "$temporary_dir" fetch --quiet --depth=1 "$repository_url" "$source_commit"
> git -C "$temporary_dir" checkout --quiet --detach FETCH_HEAD
> ```
>
> Read applicable licence declarations and notices at that commit. If copying is not permitted, report the restriction and stop.
> 4. Inspect source entries together, then copy the directory containing skillPath into `./skills/pto-calculation-rules-assistant`. Use the user's path if selected. Keep the original SKILL.md, relative links, scripts, binary assets, and executable modes. Exclude .git metadata. Reject symlinks and paths outside the Skill directory. After checking entries, use cp -a where available. A regular source directory needs no custom copy script. Do not save this page wrapper as SKILL.md.
> Preserve author credit, notices, and applicable licence files from repository or parent directories. Add PROVENANCE.md with the Skill page, source URL, actual commit, original path, and licence. Retain any existing PROVENANCE.md and record new provenance separately. Batch source inspection, copying, and provenance work where practical.
> 5. In the project root, run `skilld install ./skills/pto-calculation-rules-assistant --mode copy --plain`. If skilld is unavailable, use `npx skilld install ./skills/pto-calculation-rules-assistant --mode copy --plain`. This known command needs no help lookup. Install does not support --json. Use detected Agent targets, or add --agent for the targets the user selected. Install the local path, never the upstream selector. If installation fails, preserve the local copy and report the exact failure.
> 6. Confirm the local lockfile source and installed Agent copies once. Report the local path, actual commit, and Agent targets. After edits, reinstall the same local path. Upstream updates must not replace it. Do not publish or push unless the user asks.

# PTO Calculation Rules Assistant

## Description

Specialized assistant for understanding and implementing PTO (Paid Time Off) calculation rules, business logic, and accrual formulas in the DWP Hours Tracker. Provides guidance on PTO balance calculations, work day determination, carryover rules, and type-specific tracking.

## PTO Calculation Rules

The DWP Hours Tracker implements specific business rules for PTO management:

### Annual Allocation and Reset

- At the start of each year, the system automatically debits PTO entries with **96 hours of "PTO"** and **24 hours of "Sick"** dated January 1st
- PTO carryover from the prior year is added as an additional PTO entry on January 1st
- "Sick" time is **reset to 24 hours at the start of each year** (no carryover for sick time)

### Monthly Accrual

- Employees **accrue pto_rate hours per work day** to their PTO balance throughout the year
- **Work days** are the total non-weekend (Monday-Friday) days in each month
- **Monthly accrual** = pto_rate × work_days_in_month

### Balance Calculation

- **Available PTO** = Sum of allocation entries + Accrued - Used PTO Hours
- **Time Off Types**: "Sick", "PTO", "Bereavement", "Jury Duty" are all tracked as separate PTO types
- Each type has its own balance and usage tracking
- At year-end, usage reports must break down hours by type

## Trigger

Activate this skill when users ask about:

- PTO calculation logic and formulas
- Business rules for PTO accrual and usage
- Work day determination and monthly calculations
- Carryover policies and annual resets
- PTO balance calculations and type-specific tracking
- PTO rate application and employee-specific rules

## Response Pattern

When activated, follow this structured approach:

1. **Identify the Calculation Type**: Determine if the query involves annual allocation, monthly accrual, balance calculation, or reporting
2. **Reference Core Rules**: Explain the relevant PTO calculation rules with examples
3. **Provide Implementation Guidance**: Show how rules translate to code in `shared/businessRules.ts` or calculation functions
4. **Consider Edge Cases**: Address boundary conditions like year transitions, partial months, or rate changes
5. **Validate Against Requirements**: Ensure calculations align with year-end reporting needs

## Examples

- "How is PTO balance calculated for an employee?"
- "What are the rules for PTO carryover between years?"
- "How do we determine work days for monthly accrual?"
- "How are different PTO types tracked separately?"
- "What happens to sick time at year-end?"

## Additional Context

This skill integrates with the completed TASKS/database-schema.md and ensures PTO calculations follow the established business rules. Calculations are implemented in `shared/businessRules.ts` and `shared/ptoCalculations.ts` for consistency across client and server. Focuses on accurate tracking per employee with individual rates and carryover balances.
