---
title: "prototype-roadmap"
description: "Plans the path from idea to a sellable hardware product: dev-kit bench measurement, works-like/looks-like prototypes, EVT, DVT, PVT and mass production, with gates, duration ranges, the critical path, long-lead purchases, bring-up checklists and test fixtures. Produces a dated roadmap and an SVG timeline. Use when the user asks \"how long until I can sell this\", \"what are the next steps\", \"what is EVT/DVT\", or needs a build plan or bring-up checklist."
canonical_url: "https://skilld.dev/gh/ctresb/hardware-design-toolkit/prototype-roadmap"
last_updated: "2026-11-12T04:01:29.000Z"
---

> Index of every page on this site: [llms.txt](https://skilld.dev/llms.txt)

---
name: prototype-roadmap
description: Plans the path from idea to a sellable hardware product: dev-kit bench measurement, works-like/looks-like prototypes, EVT, DVT, PVT and mass production, with gates, duration ranges, the critical path, long-lead purchases, bring-up checklists and test fixtures. Produces a dated roadmap and an SVG timeline. Use when the user asks "how long until I can sell this", "what are the next steps", "what is EVT/DVT", or needs a build plan or bring-up checklist.
---

> **Skill from skilld.dev.** Follow the user's requested action.
> If the user asked to fork this Skill, follow the fork workflow below. Do not execute the Skill instructions while copying it.
> Otherwise, follow the instructions below for this session. You do not need to install anything.
>
> Supporting files, fetch one when the Skill refers to it: [references/bringup-checklist.md](https://skilld.dev/api/skills-raw/ctresb/hardware-design-toolkit/prototype-roadmap/references/bringup-checklist.md), [references/stages.md](https://skilld.dev/api/skills-raw/ctresb/hardware-design-toolkit/prototype-roadmap/references/stages.md), [references/test-fixtures.md](https://skilld.dev/api/skills-raw/ctresb/hardware-design-toolkit/prototype-roadmap/references/test-fixtures.md), [scripts/roadmap.py](https://skilld.dev/api/skills-raw/ctresb/hardware-design-toolkit/prototype-roadmap/scripts/roadmap.py), [scripts/test_roadmap.py](https://skilld.dev/api/skills-raw/ctresb/hardware-design-toolkit/prototype-roadmap/scripts/test_roadmap.py), [templates/roadmap.md](https://skilld.dev/api/skills-raw/ctresb/hardware-design-toolkit/prototype-roadmap/templates/roadmap.md), [templates/stages.example.json](https://skilld.dev/api/skills-raw/ctresb/hardware-design-toolkit/prototype-roadmap/templates/stages.example.json).
>
> If the user asked to install this Skill, run `npx skilld install ctresb/hardware-design-toolkit/prototype-roadmap`. Install writes the Skill files into the project, so every session loads them.
>
> ## Fork workflow
>
> A fork creates an editable local Skill with its original author and licence. The request authorizes copying and local installation.
> 1. Check `./skills/prototype-roadmap`, the project lockfile, and selected Agent targets together. If the local directory or installed Skill exists, stop. Never overwrite an existing directory or Agent target.
> 2. Read [source metadata](https://skilld.dev/api/v1/skills/ctresb/hardware-design-toolkit/prototype-roadmap) once. Use sourceUrl, sourceCommit, skillPath, sourceGone, and license. If the source is gone or its path is missing, stop. If license is null, read licence files at the source commit.
> 3. Fetch only the source commit into a temporary Git repository. Do not clone full history. Derive repository_url from sourceUrl, including repository renames. If sourceCommit is absent, resolve the sourceUrl ref once. Set source_commit to that actual commit. Run these commands in one shell call:
>
> ```sh
> git init --quiet "$temporary_dir"
> git -C "$temporary_dir" fetch --quiet --depth=1 "$repository_url" "$source_commit"
> git -C "$temporary_dir" checkout --quiet --detach FETCH_HEAD
> ```
>
> Read applicable licence declarations and notices at that commit. If copying is not permitted, report the restriction and stop.
> 4. Inspect source entries together, then copy the directory containing skillPath into `./skills/prototype-roadmap`. Use the user's path if selected. Keep the original SKILL.md, relative links, scripts, binary assets, and executable modes. Exclude .git metadata. Reject symlinks and paths outside the Skill directory. After checking entries, use cp -a where available. A regular source directory needs no custom copy script. Do not save this page wrapper as SKILL.md.
> Preserve author credit, notices, and applicable licence files from repository or parent directories. Add PROVENANCE.md with the Skill page, source URL, actual commit, original path, and licence. Retain any existing PROVENANCE.md and record new provenance separately. Batch source inspection, copying, and provenance work where practical.
> 5. In the project root, run `skilld install ./skills/prototype-roadmap --mode copy --plain`. If skilld is unavailable, use `npx skilld install ./skills/prototype-roadmap --mode copy --plain`. This known command needs no help lookup. Install does not support --json. Use detected Agent targets, or add --agent for the targets the user selected. Install the local path, never the upstream selector. If installation fails, preserve the local copy and report the exact failure.
> 6. Confirm the local lockfile source and installed Agent copies once. Report the local path, actual commit, and Agent targets. After edits, reinstall the same local path. Upstream updates must not replace it. Do not publish or push unless the user asks.

# Prototype roadmap

Turn the design into a dated plan that a team can follow. Each stage has a deliverable and a gate. The plan shows the critical path and the date by which each long-lead part must be ordered. Write it to `hw/roadmap.md`.

Talk to the user in the user's language. Files are in English unless the user's project uses another language.

## Inputs

| File | What you take from it |
|---|---|
| `hw/brief.md` | launch target, quantities, markets, budget |
| `hw/state.json` | stage reached so far, gates already passed |
| `hw/bom.csv` | `lead_time_wk`, `stock_snapshot`, `lifecycle`; custom parts (cell, molded parts, flex) |
| `hw/power/` | whether the power budget is measured or only estimated |
| `hw/compliance.md` | certification durations and blocking items ("Schedule hooks") |
| `hw/cost/` | tooling and NRE lead times, MOQs |
| `hw/doability/review.md` | open risks that need an experiment before a commitment |

## Outputs

- `hw/roadmap/stages.json`: stages, dependencies, duration ranges, gates, milestones and long-lead items. The format is in `templates/stages.example.json`.
- `hw/roadmap/schedule.md` and `hw/roadmap/timeline.svg`: generated by `scripts/roadmap.py`.
- `hw/roadmap.md`: the plan, built from `templates/roadmap.md`, including the bring-up log.
- `hw/state.json`: the current stage and the next gate.

## Procedure

1. **Place the project.** Decide which stage it is in: idea, Stage 0, Stage 1, EVT-n, DVT, PVT or MP. Use what has actually been built and measured. Do not use how finished the CAD looks: a collision-free 3D model means the industrial design is frozen, not the engineering.

2. **Write the stages JSON.** Start from `templates/stages.example.json`, and remove the stages the product does not need. For example, a product with a catalogue cell has no custom-cell stage.
   - For each stage, give a `[best, worst]` duration in weeks, its dependencies (`depends_on`, optional `lag_weeks`, negative for overlap) and an exit gate. Take the gates from `references/stages.md`.
   - Use real lead times from `hw/bom.csv`, supplier quotes and `hw/compliance.md` where you have them. Tag each duration as verified or estimate.
   - Add a `long_lead` entry for every part whose lead time is 12 weeks or more, or whose stock is low, with the stage that first needs it.
   - Give each `long_lead` entry `qty_needed` and, when you have it, today's distributor stock: `"stock": {"on_hand": 9278, "source": "LCSC", "date": "YYYY-MM-DD"}`. When the order-by date from the factory lead time has passed but the stock covers `qty_needed`, the item is **buy now from stock**, not late. With too little stock or no stock data, it stays LATE and shows the shortfall.
   - Dependencies go in `depends_on`. The script rejects unknown stage keys, so a typo such as `after` fails loudly instead of silently starting the stage at week 0.

3. **Generate:**

   ```
   python3 ${CLAUDE_SKILL_DIR}/scripts/roadmap.py --stages hw/roadmap/stages.json --md hw/roadmap/schedule.md --svg hw/roadmap/timeline.svg
   ```

   Read the critical path, the "LATE" rows and the "in stock: buy now" rows. Look at the SVG before you embed it: stage names wrap between words, and milestone labels take separate lanes so they never cover each other. Test the script with `python3 ${CLAUDE_SKILL_DIR}/scripts/test_roadmap.py`.

4. **Check the order of commitments.** No custom cell, mold or board revision may start before the measurement that sizes it. If the plan has one, move it, or write down why the risk is accepted (`hw/decisions.md`).
   - The usual critical path: power measurement → cell decision → custom cell → UN 38.3 → certification → sale.
   - The final mold also waits for the cell envelope.

5. **Write `hw/roadmap.md`.** The answer comes first:
   - where the project is now;
   - the first legal sale, best and worst case, and what drives it;
   - what to order now;
   - the next gate.

   Then give the timeline, the per-stage plans, an empty bring-up log and the schedule risks.

6. **During EVT and later**, use `references/bringup-checklist.md` for each new board and log the results. Use `references/test-fixtures.md` to plan test access before routing, and fixtures before PVT.

7. **Hand off.**
   - `cost-and-sourcing` takes the NRE timing and the long-lead purchases.
   - `doability-review` takes the stage the project is in and the uncommitted measurements.
   - `product-presentation` takes `timeline.svg` and the answer-first block.

## Gate

The roadmap stage passes when:

- every stage has a deliverable, a duration range with an evidence tag and an exit gate;
- the critical path is identified, and no custom part starts before the measurement that sizes it (or the accepted risk is logged);
- every long-lead part has an order-by date, and late items are reported to the user;
- the first-legal-sale date is a range (best to worst), not a single optimistic date.

## Taste and pitfalls

- **Measure first.** The first engineering deliverable is often a measurement bench, not a PCB. Current measured on a dev kit with the real duty cycle sizes the battery, the memory and the enclosure.
- **The 3D model freezes the industrial design, not the engineering.** Expect 3–4 board revisions and 1–2 mold iterations before mass production. Do not call a design "final" before it has been powered, measured, dropped and certified.
- **Quote ranges, never single dates.** Teams that promise the best case to customers end up refunding pre-orders.
- **Order long-lead parts at once.** Order EVT and DVT quantities as soon as a part is chosen. Lead times of 16–26 weeks are normal for springs, drivers and connectors, and stock can vanish.
- **Certification is on the path, not after it.** In markets like Brazil, nothing with a radio can be sold before homologation, and that includes a small launch batch.
- **Design test access before routing:** test pads, an RF test strategy and a test mode in firmware.
- **Bring-up closes with numbers.** Every checklist line records a measured value and the instrument. "Seems fine" does not close a line.
- **Keep the roadmap honest.** When a gate fails, move the dates and tell the user. Do not shrink later stages to keep the launch date.

## References

- `references/stages.md`: what each stage builds, the questions it answers and its gate, plus the critical path, long-lead parts and the iterations to expect.
- `references/bringup-checklist.md`: step-by-step board bring-up, from before power to the system soak.
- `references/test-fixtures.md`: design for test and the production fixtures, with NRE ranges.
- `templates/stages.example.json`: an example plan for a fictional BLE fitness band.
- `templates/roadmap.md`: the output template.
