Index of every page on this site: llms.txt
All skills
gesh75 avatar

/dc-fabric-upgrade

@6fc5ef5
Run it yourself

Plan data-center fabric upgrades (ISSU, SMU, or cold) with traffic shift and abort criteria. Use when a spine, leaf, or border-leaf train is moving and you need a sequenced window.

  • 1 file
  • 1.2 KB
  • MIT
  • Updated 3 months ago
  • GitHub
Use this Skill: https://skilld.dev/gh/gesh75/claude-skill-lint/dc-fabric-upgrade

Nothing lands on disk. Nothing to clean up.

Fork this Skill

Edit a local copy. It keeps the author and licence.

SKILL.md

≈50 tokens for metadata: the name and description. ≈243 when used: this file.

Description uses 2.5% of example budget

Before choosing a Skill, your Agent reads its name and description. All available Skills share that space.

  • A shorter description leaves more room for other Skills. This entry exceeds our 1% size suggestion.

In our Claude Code example, all Skill names and descriptions share 8,000 characters. This Skill uses ≈200 characters, or 2.5%.

The 1% threshold is a size suggestion. Longer descriptions can still fit.

Your model, settings, and other Skills decide how much text your Agent can read.

Example settings and source

The example uses a 200k-token context and default Claude Code settings. The count includes the name, description, separators, and when_to_use when present. Codex also counts local file paths.

Skit's source and limits: Codex 0.160.1, Claude Code 2.1.292.

DC fabric upgrade

Do not use for campus stack upgrades or firewall HA failover. Not for optics swaps without a train change.

Procedure

  1. Read the release notes for the target train: EVPN, BFD, and VXLAN caveats. Lab the SMU on a spare leaf.
  2. Shift: one spine at a time, then border, then a canary leaf pair, then the rest. Never two spines.
  3. Abort criteria written before the window: BGP session count, EVPN route count, packet loss > 0.1% for 30s.
  4. Optics and FEC stay pinned. Do not "also replace QSFP" in the same window.
  5. Verify per device: control-plane, forwarding, then the next device.
window Sat 01:00-05:00
  01:00  drain spine-1  confirm ECMP  N-1
  01:40  ISSU spine-1
  02:10  un-drain  watch 15m
  abort if evpn type-2 delta > 1%

Anti-patterns

  • Never upgrade both spines because "ISSU is hitless".
  • Do not mix a code upgrade with a cabling change.

Safety

Abort is a first-class step. A failed canary stops the fleet.

Source: SKILL.md on GitHub

No rule matched.

skilld matched fixed text patterns in SKILL.md and file names. Patterns miss obfuscated code.

skilld run checks every file with the same patterns. It asks for approval before it loads a Skill with a behavior marked Needs approval.

No third-party reports yet.

Signed by skilld at 6fc5ef5. This ties the file your Agent reads to that commit on GitHub. It does not review the instructions.

Last checked against GitHub 2 weeks ago.

Activeupdated 3 months ago
argument-hint
[role] [from] [to]
All 1 allowed tools
Read Grep

README badge

README badge for gesh75/claude-skill-lint/dc-fabric-upgrade