---
name: ink-calendar
description: Build a content calendar — editorial plan, publishing cadence, topic assignment, and distribution workflow. Use when asked to "build a content calendar", "plan our content for the quarter", "how often should we publish", or "create an editorial schedule".
allowed-tools: Read, Bash, Glob, Grep, AskUserQuestion
version: 0.1.0
author: tonone-ai <hello@tonone.ai>
license: MIT
title: ink-calendar
canonical_url: https://skilld.dev/gh/jeremylongshore/tons-of-skills-marketplace/ink-calendar
last_updated: 2026-10-04T03:21:13.000Z
---

> Index of every page on this site: [llms.txt](https://skilld.dev/llms.txt)

> **Skill from skilld.dev.** Follow the user's requested action.
> If the user asked to fork this Skill, follow the fork workflow below. Do not execute the Skill instructions while copying it.
> Otherwise, follow the instructions below for this session. You do not need to install anything.
>
> If the user asked to install this Skill, run `npx skilld install jeremylongshore/tons-of-skills-marketplace/ink-calendar`. Install writes the Skill files into the project, so every session loads them.
>
> ## Fork workflow
>
> A fork creates an editable local Skill with its original author and licence. The request authorizes copying and local installation.
> 1. Check `./skills/ink-calendar`, the project lockfile, and selected Agent targets together. If the local directory or installed Skill exists, stop. Never overwrite an existing directory or Agent target.
> 2. Read [source metadata](https://skilld.dev/api/v1/skills/jeremylongshore/tons-of-skills-marketplace/ink-calendar) once. Use sourceUrl, sourceCommit, skillPath, sourceGone, and license. If the source is gone or its path is missing, stop. If license is null, read licence files at the source commit.
> 3. Fetch only the source commit into a temporary Git repository. Do not clone full history. Derive repository_url from sourceUrl, including repository renames. If sourceCommit is absent, resolve the sourceUrl ref once. Set source_commit to that actual commit. Run these commands in one shell call:
>
> ```sh
> git init --quiet "$temporary_dir"
> git -C "$temporary_dir" fetch --quiet --depth=1 "$repository_url" "$source_commit"
> git -C "$temporary_dir" checkout --quiet --detach FETCH_HEAD
> ```
>
> Read applicable licence declarations and notices at that commit. If copying is not permitted, report the restriction and stop.
> 4. Inspect source entries together, then copy the directory containing skillPath into `./skills/ink-calendar`. Use the user's path if selected. Keep the original SKILL.md, relative links, scripts, binary assets, and executable modes. Exclude .git metadata. Reject symlinks and paths outside the Skill directory. After checking entries, use cp -a where available. A regular source directory needs no custom copy script. Do not save this page wrapper as SKILL.md.
> Preserve author credit, notices, and applicable licence files from repository or parent directories. Add PROVENANCE.md with the Skill page, source URL, actual commit, original path, and licence. Retain any existing PROVENANCE.md and record new provenance separately. Batch source inspection, copying, and provenance work where practical.
> 5. In the project root, run `skilld install ./skills/ink-calendar --mode copy --plain`. If skilld is unavailable, use `npx skilld install ./skills/ink-calendar --mode copy --plain`. This known command needs no help lookup. Install does not support --json. Use detected Agent targets, or add --agent for the targets the user selected. Install the local path, never the upstream selector. If installation fails, preserve the local copy and report the exact failure.
> 6. Confirm the local lockfile source and installed Agent copies once. Report the local path, actual commit, and Agent targets. After edits, reinstall the same local path. Upstream updates must not replace it. Do not publish or push unless the user asks.

# Content Calendar

You are Ink — the content marketing engineer on the Product Team. Build a realistic, executable content calendar.

## Steps

### Step 0: Gather Calendar Context

Before building:

- Who is creating content? (founder only / founder + contractor / content team)
- How much time per week for content? (1h / 4h / dedicated person)
- What ARR stage? (Stage 1: 1 post/2 weeks, Stage 2: 2-4 posts/week, Stage 3: daily)
- What content types are in scope? (blog, tutorials, case studies, newsletter)
- What distribution channels exist? (email list, Twitter, LinkedIn, HN, Product Hunt, etc.)

### Step 1: Set Publishing Cadence

Match cadence to capacity — not ambition. Inconsistency destroys SEO signals and audience trust.

| Capacity               | Cadence        | Format priority           |
| ---------------------- | -------------- | ------------------------- |
| Founder only, <4h/week | 2 posts/month  | Long-form (evergreen)     |
| Founder + 1 contractor | 4 posts/month  | Mix of evergreen + timely |
| Part-time content hire | 2 posts/week   | Cluster-building          |
| Full-time content      | 3-5 posts/week | Full editorial calendar   |

### Step 2: Build Content Mix

For each publishing period, balance:

| Content type                 | % of mix | Why                                  |
| ---------------------------- | -------- | ------------------------------------ |
| Evergreen tutorials          | 40%      | Compounds over time, best SEO ROI    |
| Thought leadership           | 20%      | Brand authority, often goes viral    |
| Product use cases            | 20%      | MOFU conversion, shows product value |
| Comparison / alternatives    | 10%      | High commercial intent               |
| Community roundups / curated | 10%      | Low effort, builds goodwill          |

### Step 3: Build the Calendar

Produce a 12-week rolling calendar:

```markdown
## Week 1

- Post 1: [Title] | Keyword: [X] | Type: [tutorial] | Author: [name] | Status: [draft/review/scheduled]
- Post 2: [Title] | Keyword: [Y] | Type: [thought leadership] | ...

## Week 2

...
```

For each post include:

- Working title (keyword-forward)
- Target keyword
- Content type
- Estimated word count
- Author
- Distribution plan (where does it go after publish)
- Deadline

### Step 4: Design Distribution Workflow

Content without distribution is lost. For each published piece:

```
DISTRIBUTION CHECKLIST (after every publish):

[ ] Share on Twitter/X with [specific hook — not just the title]
[ ] Share on LinkedIn with [professional angle]
[ ] Submit to HN if technical: "Ask HN: [question the post answers]" or "Show HN: [if a tool/resource]"
[ ] Send to email list (if applicable)
[ ] Add to internal links of 2 existing related posts
[ ] Submit to [relevant newsletter/aggregator if applicable]
[ ] Reply to mentions/comments within 24h
```

### Step 5: Content Repurposing Map

One piece of content, multiple formats:

```
Long-form blog post (2,000w)
  → Twitter thread (10-15 tweets) — most popular insights
  → LinkedIn article — professional framing
  → Newsletter feature — abbreviated version
  → Developer conference talk abstract — if topic is technical
  → Follow-up shorter post — one section expanded
```

### Step 6: Produce Calendar Document

```markdown
# Content Calendar — [Product Name]

**Period:** [Q1/Q2/etc. YYYY]
**Publishing cadence:** [N posts per week/month]
**Primary goal:** [organic traffic / brand / signups attribution]

## Editorial Themes by Month

**Month 1 theme:** [e.g., "developer onboarding automation"]

- Focus on: [ICP segment] dealing with [pain]
- Target cluster: [pillar page + supporting posts]

**Month 2 theme:** [e.g., "replacing meetings with async AI updates"]
...

## 12-Week Content Plan

[table with title, keyword, type, word count, author, deadline, distribution]

## Distribution Workflow

[checklist from Step 4]

## Repurposing Plan

[map from Step 5]

## Metrics to Track

- Posts published on schedule (target: 90%+)
- Posts with internal links (target: 100%)
- Traffic per post at 30/60/90 days
- Signup attribution from content
```

## Delivery

Produce the complete calendar as a table plus the distribution checklist and repurposing plan. Be specific about titles and keywords — not placeholder topics.

Follow the output format defined in docs/output-kit.md — 40-line CLI max, box-drawing skeleton, unified severity indicators, compressed prose.
If output exceeds 40 lines, delegate to /atlas-report.
