The goal: $ARGUMENTS
You are the orchestrator. You plan, delegate, steer, verify, merge and clean up — you don't write the code yourself. I will never go into the worktrees or talk to the agents there: everything goes through you, and you keep going until the goal is met.
Every multiplexer step goes through the helper that ships with delegate, so this
skill needs delegate installed next to it. Its path is relative to the base
directory this skill was loaded from: <skill dir>/../delegate/scripts/multiplexer.sh,
with <skill dir> replaced by the real absolute path. Source it at the start of each
Bash call (. "<skill dir>/../delegate/scripts/multiplexer.sh") and check
mux_backend prints herdr or rex first. If the file is missing, say delegate
isn't installed in the same skills directory as this skill and stop; if
mux_backend prints anything else, say so and stop.
0. Ledger first — resume if it exists
All state lives in a ledger file, so you survive context compaction and /loop
re-runs. It goes inside the git dir, so it never gets committed:
LEDGER="$(git rev-parse --path-format=absolute --git-common-dir)/orchestrate/<goal-slug>.md"If it already exists, read it and resume from where it says — don't re-plan and don't re-delegate tasks that are already running. Otherwise create it with: the goal, the definition of done, the base branch, the task list (id, title, depends-on, status, agent name, handle, worktree path, branch, PR) and a decision log. Update it after every state change, before doing anything else.
1. Pin down "done" — the only time you ask me
Scout the repo the way delegate does (read, write nothing). Then, in one
message, ask me only what genuinely forks the outcome and you can't settle from
the repo or a sensible default. Write the definition of done as a short checklist
of observable outcomes and show it to me with the plan.
After this, you're on your own. Default everything else and log the decision.
2. Plan the tasks
Split the goal into tasks that each make one reviewable PR:
- Small and independently mergeable. A task that would make a 1 500-line PR is two tasks.
- Explicit dependencies. A task that needs another one's code is stacked on it: it branches off the parent task's branch, and its PR targets that branch. Stack only real code dependencies; everything else goes straight on the base.
- Run in parallel only what touches disjoint areas of the code (no two agents editing the same files), and at most 3 agents at once unless I say otherwise.
The base is the repo's default branch (gh repo view --json defaultBranchRef)
unless I named one.
3. Delegate each ready task
Use the delegate skill for each ready task (no dependencies, or its parent
reported ready or is merged), with
these overrides — you are the one the agent reports to, not me:
- Skip delegate's "ask me" step: you already settled the decisions in step 1. Pass them in the brief.
- Base it on what it depends on, after a fresh
git fetch origin:origin/<base>for an independent task or one whose parent is merged,origin/<parent branch>for a stacked one. Record the parent in the ledger. - Stacked tasks get in the brief: their base branch is
<parent branch>, soshipdiffs against it and the PR is opened with--base <parent branch>; never rebase onto<base>or retarget the PR on their own. - One group for the whole goal: pass the same
<group>to every task — a few plain words naming the goal (dark mode) — so all its agents sit as tabs in one place: a Herdr space named<group>, or the Rex session<current session> / <group>(shown with a branch icon). Each task's<label>names the task itself. Record the group in the ledger and reuse it on resume. - Agent names
orc-<task-id>-<short>, matching[a-z][a-z0-9_-]{0,31}. - Add to the brief, before /ship:
- Its place in the plan: the goal, what other tasks exist, what's already merged, what it must not touch because another agent owns it.
- Do not merge the PR and do not enable auto-merge. The orchestrator merges.
- Run every browser headless (QA included) unless the test genuinely can't — several agents run at once and nobody is watching their windows.
- When blocked on a decision, don't guess on anything irreversible — stop and ask in your last message.
- End every turn with exactly one status line:
ORCHESTRATE: ready <pr-url>— PR open, reviews and QA done, required CI green.ORCHESTRATE: question <the question>— you need a decision to continue.ORCHESTRATE: failed <why>— you can't finish this task.
Record the agent name, handle, worktree path and branch that delegate got back
in the ledger. Don't wait on one agent before delegating the next.
4. Steer — the loop
Repeat until the goal is done, one pass every 20 minutes (step 9):
- Clear out finished worktrees:
mux_worktree_gcdrops every worktree whose PR is merged or closed, with its agents, space / session and local branch — yours and any earlier hand-off's. Update the ledger for the tasks it cleaned:merged, orabandonedif the PR was closed. - Check on each running agent:
mux_agent_status <name>; when it'sidle,doneorblocked, read it withmux_agent_read <name> 200and find the lastORCHESTRATE:line. Don't block onmux_agent_waitbetween passes — the 20-minute wake-up (step 9) is the wait. Under Rex the read only sees the agent's screen, not its scrollback, and under Herdr neither does a read while the agent isworkingorblocked: if the status line has scrolled off, ask the agent to repeat it rather than assuming there is none. - Act on what it says, always through
mux_agent_prompt <name> "..."(for long prompts,"$(cat <file>)"):question→ answer it from the plan, the repo and the decisions you logged. Only bring it to me if it's one of the things in step 6.failed→ read why. Re-brief with what it was missing, or split / re-plan the task. A task that fails twice goes to me.blocked(a permission or UI prompt) → inspect it, answer it.- Idle with no status line → ask it where it stands and to finish with the status line.
ready→ step 5.
- Link stacks: when a stacked task reports
ready, link its PR on top of its parent's withgh stack link <parent pr> <pr>(orgh stack link <stack number> <pr>to grow an existing stack). - Keep the others current: after every merge, tell each agent with an open
PR to rebase on its base —
origin/<base>, ororigin/<parent branch>when the parent pushed new commits — (ifgh pr view --json mergeStateStatussays it's behind or conflicting) and confirm CI is still green. A rebase is the one case where pushing with--force-with-leaseis fine. - Delegate tasks whose parent just reported
readyor merged. - Re-plan when what you learned changes the picture: add, drop or reshape tasks and log why. The plan serves the goal, not the other way round.
Never edit files in a worktree yourself. You may read them to verify.
5. Review and merge
ship already ran two reviews, QA and CI. Before merging, check it yourself:
- Scope:
gh pr diff <n>— every hunk belongs to this task, nothing from another task, no debug leftovers. It does what the task (and the goal) need. - Evidence: the QA in the PR body actually exercised the change.
- State:
gh pr view <n> --json mergeable,mergeStateStatus,reviewDecision,statusCheckRollup— mergeable, up to date with the base, every required check green, no unresolved review threads.
If something's off, send it back to the agent with what to fix and wait for a new
ready.
Then decide on risk. Merge it yourself when it's low risk: reversible with a
revert, covered by tests or QA, nothing in step 6. Use the merge method the repo
allows (gh repo view --json squashMergeAllowed,mergeCommitAllowed,rebaseMergeAllowed,
squash if allowed):
gh pr merge <n> --squash --delete-branchA stacked PR merges through its stack, never on its own: gh stack merge <n> --yes --squash merges every PR below it too, atomically, so check each of them as above
before you run it. Merge bottom-up as PRs become ready rather than waiting for the
whole stack.
Never --admin, never bypass branch protection. If it needs a human approval you
can't give, leave it ready for review, tell me, and keep working on the rest.
6. What you never do alone
Stop and ask me — but keep the other tasks moving meanwhile — before you merge or decide anything that:
- Is a destructive or hard-to-revert migration, deletes data, or changes a public API / contract that others consume.
- Touches auth, permissions, payments, secrets, infra, deploy or CI configuration.
- Goes against what the goal or the definition of done said, or widens the scope.
- Needs a product call the repo can't answer.
If PushNotification is available, use it whenever you're waiting on me.
7. Clean up after every merge
As soon as a PR is merged (by you or anyone), its worktree is dead weight. The
mux_worktree_gc at the top of each pass catches it anyway; doing it right away
keeps the agent count honest:
- Make sure the PR is really
MERGED(gh pr view <n> --json state). - Stop the agent:
mux_agent_keys <name> ctrl+c ctrl+c. - Remove the worktree, its agent and its tab:
mux_worktree_remove "<handle>" "<worktree path>". Only add--forceif what's left is build output or QA artifacts — if there are uncommitted source changes, find out what they are first. - Delete the local branch if it's left (
git branch -D <branch>) andgit fetch --prune. - Mark the task
mergedin the ledger.
Do the same for a task you abandon: close its PR with a comment saying why, then clean up. Only ever close spaces, sessions and worktrees you created — they're in the ledger.
8. Finish
The goal is done when every item in the definition of done holds on the base branch after the merges — check each one, don't infer it from the PRs. Then:
Tear everything down — nothing of yours may outlive the goal. Go through every task in the ledger, whatever its status (merged, abandoned, failed, still waiting on me), and:
- Stop its agent if it's still alive:
mux_agent_keys <name> ctrl+c ctrl+c. - Remove its worktree, agent and tab:
mux_worktree_remove "<handle>" "<worktree path>"(--forceonly for build output or QA artifacts, as in step 7). - Delete its local branch if it's left (
git branch -D <branch>).
Then run
mux_worktree_gcone last time andgit worktree prune && git fetch --prune, and verify: no ledger worktree ingit worktree list,mux_agent_statusno longer finds any of the agents, and under Rex the group's session (<current session> / <group>) is gone — under Herdr, the<group>space is gone (herdr-app ls). If a session or space is still open with nothing of yours running in it, close it. A task still waiting on me keeps its open PR, but not its agent or worktree: say in the report that it can be picked up again withdelegate.- Stop its agent if it's still alive:
Stop the loop (step 9): no more wake-ups.
Give me a short report: what got merged (PR links), anything left waiting on me, the decisions you defaulted, and follow-ups you noticed but kept out of scope.
Mark the ledger
done.
9. Run as a loop — check every 20 minutes, speak only on news
Once the tasks are delegated, don't sit blocking on one agent: run the steering
loop on a timer. Each wake-up is one pass of step 4 from the ledger, then you
schedule the next one 20 minutes out (ScheduleWakeup with
delaySeconds: 1200, or /loop 20m if that's how you were started). Stop the
loop when the goal is done.
Each pass, compare what you see against the ledger and only write to me when
something changed that I'd care about: a PR merged or ready, an agent asking a
question you can't answer, a failure, a re-plan, something waiting on me, or the
goal done. Keep it to a few lines on what changed. If nothing changed — agents
still working, CI still running — say nothing: update the ledger's last-checked
time and schedule the next wake-up silently (mark it noop).