Portfolio Case Study Writer
When to Use This Skill
Use this skill when the user:
- Wants to create portfolio case studies
- Needs to expand resume bullets into detailed writeups
- Is building a portfolio website
- Mentions: "case study", "portfolio", "project writeup", "work samples", "portfolio piece"
Candidate Guardrails (always apply)
Truthfulness: Every claim, metric, course, certification, skill, tool, and responsibility must come from facts the user provided or confirmed. Never generate specifics the user hasn't stated. Missing number? Insert [USER-CONFIRMED METRIC] and ask. Estimates only on explicit request, marked (~ or range), with a logged derivation.
Privacy & age signals: On resumes, omit graduation years by default for senior candidates and never include street address, DOB, or photo (US industry norm; academic CVs and non-US norms differ — follow field conventions there). Frame seniority as scope, not elapsed time; total-years phrasing is the user's choice, not a default. Never mention legal disputes, HR complaints, or settlements; reason-for-leaving is one neutral, forward-looking line, used consistently.
Confidential search (employed users): Ask before naming the current employer in any outbound or public artifact; offer blind variants. Never publish employer-confidential metrics without an explicit confidentiality pass.
Examples in this skill are illustrative only: never copy numbers, names, employers, venues, patent numbers, or identifiers from examples into user output.
Anti-Fabrication Rules (non-negotiable)
- Only real, measured outcomes. Never invent, round "helpfully," or estimate a metric and present it as measured. If the user didn't measure it, it doesn't go in the case study.
- If you can't quantify, describe scope instead. "Owned the migration of 40+ services across 3 teams" is legitimate; "improved efficiency ~35%" (made up) is not.
- Label percentages correctly — relative vs. absolute. A drop from 68% to 44% is a 24-percentage-point drop or a ~35% relative reduction. "-35%" alone misrepresents it. Always state which you mean.
- Directional metrics need the same approval as absolute ones. "Roughly a third," "multi-second → sub-second," "~40% YoY" — each is still a claim about the work; it must trace to something the user measured or confirmed. Get explicit user approval (or an NDA-driven choice) for every directional figure before publishing.
- Interview defense test: every claim — measured, directional, or scope — must survive 5 minutes of follow-up questioning on provenance (how was it measured? what was the baseline?) and permission (is the user actually allowed to publish this number/diagram/customer story?). If either fails, cut the number or downgrade it to scope description.
Step 0: Confidentiality / NDA Gate
Before writing anything, determine what may be published. Ask the user:
- What does their employer/contract permit? (NDA terms, IP assignment, "publicize only with approval" policies, open-source contribution rules)
- What did they get written approval to share, if anything?
- Is the work itself public? (shipped OSS, launched product, published post-mortem — public work is safer to describe)
- Who owns the artifacts? (designs, code, docs — portfolio use may need permission even for work the user authored)
- Do customer-data terms apply? (contractual non-disclosure of customer names/metrics, even "anonymized" ones)
- Are screenshots/diagrams approved for publication, or text-only? (rerun this gate per artifact)
- Do post-employment publication rights survive? (some contracts restrict writing about the employer's business after leaving)
Anonymization patterns when the employer or details must stay confidential:
- Company: "a Series-B developer-tools company", "a top-5 US e-commerce retailer", "a fintech startup (50 engineers)"
- Directional metrics: "reduced p99 latency by roughly a third", "multi-second → sub-second", "single-digit-millisecond" instead of exact figures
- Percentage-only instead of absolute revenue: "grew ARR ~40% YoY" without the dollar base
- NEVER include customer-identifiable data: customer names, logos, deal sizes tied to a named account, user-level data, screenshots with real names/data
- Architecture: describe patterns (event-driven, CQRS, sharded Postgres) without internal service names, infra topology numbers, or security-sensitive details
If the user is unsure what's permitted, default to maximum anonymization and recommend confirming with their manager or legal.
Estimate Policy
Measured outcomes are presented as measured. Estimates or projections appear only in a clearly labeled estimate/projection subsection, marked (~ or range) with the derivation — never blended into the Results table as if measured.
Case Study Structure
1. Overview (project summary + one-line impact)
2. Problem (what needed solving, constraints)
3. Process (research, options considered, decisions + rationale)
4. Solution (what was built; artifacts)
5. Results (measured outcomes, correctly labeled)
6. Learnings (what worked, what you'd change)Target: 3–5 min quick read, 10–15 min deep dive.
Role-specific emphasis (full design and PM examples live in references/design-pm-examples.md):
- Product Manager: strategy, prioritization, stakeholders, metrics, trade-offs
- UX/Designer: research, process, artifacts, usability
- Software Engineer: architecture, problem-solving, system design, performance
- Marketing: strategy, targeting, creative, ROI/attribution
Worked Example — Staff Software Engineer
Fictional example for structure only — never copy its facts into user output. Bracketed items are placeholders; a real case study carries the user's confirmed numbers.
# Re-Architecting the Real-Time Notification Pipeline
**Company:** a [Company stage] company (anonymized per NDA)
**Role:** Staff Software Engineer (tech lead, [N engineers])
**Timeline:** [duration]
**Summary:** Replaced a polling-based notification system with an
event-driven pipeline, cutting p99 delivery latency from [before] to
[after] while reducing delivery infrastructure cost per million
notifications by roughly half.
## Problem
- Legacy pipeline polled upstream services on a fixed interval; peak
events queued for [duration], causing support spikes during incidents.
- Single consumer scaled vertically; it was the largest single line item
in the team's infra budget.
- Constraints: zero dropped notifications during migration; no customer-
facing API changes; [duration] deadline.
## Process
- Instrumented the legacy path first: measured per-stage latency and
drop rate for two weeks to establish a baseline (no baseline, no case
study numbers).
- Options considered: (a) tune polling interval (rejected: cost scales
linearly, ceiling far above target), (b) fan-out consumers on the
existing queue (rejected: ordering guarantees), (c) event-driven design
on a log (Kafka-style) with consumer groups (chosen).
- Key decisions: idempotent consumers keyed on notification ID (allows
at-least-once delivery); per-tenant partitioning for ordering; DLQ
with replay tooling.
## Solution
- Event producers with schema-versioned envelopes (backward-compatible rollout, dual-write during migration)
- Consumer groups with per-tenant rate limiting; shadow deployment running both pipelines, diffing outputs for [window] before cutover
- Runbooks + alerting on delivery SLO before cutover
## Results (measured over [window] post-cutover)
| Metric | Before | After | Change |
|--------|--------|-------|--------|
| p99 delivery latency | [measured] | [measured] | [relative/absolute, labeled] |
| p50 delivery latency | [measured] | [measured] | [relative/absolute, labeled] |
| Infra cost / 1M notifications | [PLACEHOLDER] | [directional — user-confirmed] | directional (NDA) |
| Notification loss rate | [measured] | [measured] | [pp drop, labeled] |
Numbers the user did not measure stay [PLACEHOLDER] or directional — never invented.
## Learnings
- Dual-write + shadow traffic diff caught ordering bugs the test suite missed.
- What I'd do differently: schema registry governance from day one — retrofitting it mid-project cost weeks.Worked Example — AI/ML Engineer
Fictional example for structure only — never copy its facts into user output. Bracketed items are placeholders; a real case study carries the user's confirmed numbers.
# Shipping an LLM Feature with an Eval Harness and Safe Rollout
**Company:** a [Company stage] developer-tools company (anonymized)
**Role:** Senior ML Engineer (project lead, [N engineers + PM])
**Timeline:** [duration] to GA
**Summary:** Shipped an AI code-review assistant to [PLACEHOLDER]
active users with a measured acceptance pipeline: offline eval harness,
human-labeled golden set, and staged rollout with automated rollback.
## Problem
- Users wanted automated review comments; the prototype hallucinated
in demos and leadership wouldn't ship without quality evidence.
- Constraints: p95 review latency budget of [target]; inference cost
budget per PR; no user data leaves the region (compliance).
## Process — the eval harness came first
- Built a golden set of [N] real (anonymized, user-consented) PRs with
human labels for "comment worth posting"
- Offline harness scoring: precision@k against golden set, hallucination
rate (claims about nonexistent code), latency p50/p95, cost per PR
- Model selection: [N] candidates (one fine-tuned small model, two API
models) evaluated on identical harness runs; the fine-tuned model won
on cost and latency, lost on precision — chose the mid-size API model
with a caching layer for the cost/quality trade-off
- Prompt/context decisions: retrieval over the diff + repo tree only
(not full repo) to hit the latency budget; this cost ~[X] pp precision
— documented as a known trade-off
## Architecture & latency/cost trade-offs
- Pipeline: diff ingestion → context retrieval → model call → filter
stage (rules + a small classifier for "postable") → UI
- Caching repeated reviews on identical diffs cut cost per PR by
[PLACEHOLDER]% (measured in rollout telemetry, not projected)
- Degradation path: if p95 latency exceeds budget, shed to a smaller
fallback model rather than failing open
## Migration rollout
- Internal flag → single-digit % of users → majority → 100%, gated on
eval metrics
holding; automated rollback if acceptance/precision dropped below
threshold
- Kill switch per tenant for compliance incidents
## Results
| Metric (target → measured at GA) | [targets stay placeholders until the user supplies real measurements] |
Precision@3 vs golden set · hallucination rate · p95 latency · cost per reviewed PR — each shown as [PLACEHOLDER] until measured.
## Incident writeup
- Weeks post-GA, a prompt-version deploy regressed precision silently
(offline evals passed; live drift). Detection: user "unhelpful" rate
alert fired within hours. Response: rolled back the deploy, added a
live-traffic sampled eval to the harness as a permanent guardrail.
Writing incidents up like this demonstrates judgment, not just wins.
## Learnings
- Offline evals ≠ live quality; sampled live evals are now standard on
this team.
- The filter stage was the highest-ROI component — cheap classifier
gating expensive model output.Visual Elements
- Must-have: before/after comparisons, architecture diagrams, results charts
- Nice-to-have: journey maps, wireframe evolution, research artifacts
- Blur/redact sensitive data in every screenshot (rerun the NDA gate on images, not just text)
Output Format
# CASE STUDY: [PROJECT NAME]
## Quick Facts
- **Role:** [role] | **Company:** [name or anonymized descriptor]
- **Timeline:** [duration] | **Team:** [composition]
- **Impact:** [one-line result, correctly labeled]
## Overview
[2-3 sentences]
## Problem
[Context, pain points, constraints]
## Process
### Research / baseline
### Options considered
### Key decisions (and why)
## Solution
[What was built; artifacts]
## Results
| Metric | Before | After | Change (label relative vs. absolute) |
[Only measured numbers; scope description otherwise]
## Learnings
[What worked, what you'd do differently]
## Visual Asset List
[Images needed, each NDA-checked]Quality Checklist
- ✅ Step 0 NDA/confidentiality gate completed; anonymization applied
- ✅ Every metric real, measured, and correctly labeled (relative vs. absolute); directional metrics carry the same approval
- ✅ No customer-identifiable data anywhere, including screenshots
- ✅ Each claim survives 5 minutes of interview follow-up — provenance and permission separately
- ✅ Scope described where quantification isn't available
- ✅ Your specific contribution is clear (vs. the team's)
- ✅ Honest learnings section
- ✅ Appropriate length (3–10 min read)