MANDATORY prerequisite — load this skill BEFORE every `generate_diagram` tool call. NEVER call `generate_diagram` directly without loading this skill first. Trigger whenever the user asks to create, generate, draw, render, sketch, or build a diagram — flowchart, architecture diagram, sequence diagram, ERD or entity-relationship diagram, state diagram or state machine, gantt chart, or timeline. Also trigger when the user mentions Mermaid syntax or wants a system architecture, decision tree, dependency graph, API call flow, auth handshake, schema, or pipeline visualized in FigJam. Routes to type-specific guidance, sets universal Mermaid constraints, and tells you when to use a different diagram type or skip the tool entirely (mindmaps, pie charts, class diagrams, etc.).

Use this Skill: https://skilld.dev/gh/figma/mcp-server-guide/figma-generate-diagram

This session only. Nothing lands on disk.

referencesgantt.md

≈3.3k tokens on demand. Your agent reads this file only when SKILL.md points to it.

Gantt Charts

Use this reference for gantt charts — project timelines, roadmaps, phased work, sprint plans, launch calendars, anything where the primary dimension is time and items have a start, duration, and optionally a dependency on other items.

If the user wants an abstract dependency graph (A depends on B) without specific dates, use a flowchart instead. Gantt is for time-on-an-axis.

Contents

  1. When to use a gantt chart
  2. Required skeleton
  3. dateFormat
  4. Sections
  5. Task syntax
  6. Task tags (states)
  7. Milestones
  8. Intra-day charts (time-of-day)
  9. What's NOT supported
  10. Limitations and gotchas
  11. When gantt syntax isn't enough: build a custom timeline instead
  12. Best practices
  13. Validation checklist
  14. Complete example
  15. Calling generate_diagram

1. When to use a gantt chart

Good fits:

  • Project roadmaps — initiatives across quarters or months
  • Release plans — milestones leading to a launch
  • Sprint / iteration plans — tasks across a 1–4 week window
  • Event schedules — intra-day or multi-day agendas

Bad fits (route to a different diagram type):

  • Abstract dependency trees without dates → flowchart
  • API call sequence between services → sequence diagram
  • State machine → state diagram
  • Data model → ER diagram

2. Required skeleton

gantt
    title Project Timeline
    dateFormat YYYY-MM-DD
    section Phase 1
    Research        :r1, 2026-01-05, 10d
    Prototype       :p1, after r1, 7d
    section Phase 2
    Build           :b1, 2026-01-25, 3w
    Launch prep     :l1, after b1, 5d

Every chart needs: the gantt keyword, a dateFormat directive (YYYY-MM-DD for date charts, HH:mm for intra-day — see §3), and at least one task with a real start. title is optional but strongly recommended.

3. dateFormat

Two reliable formats, pick one based on the chart's time scale:

  • dateFormat YYYY-MM-DD — the default. Use for any chart with day-or-larger granularity (sprints, roadmaps, launch plans).
  • dateFormat HH:mm — intra-day only. Tasks are time-of-day starts; see §8 for the full setup.

Other formats (DD/MM/YYYY, MM-DD-YYYY, full datetimes) may parse but can hit the preprocessing layer and produce unexpected output. Stick to the two forms above.

4. Sections

section <Section Name>

Sections are horizontal lanes in the rendered chart. Use them to group tasks by:

  • Phase (Discovery / Build / Launch)
  • Team or owner (Design / Eng / Marketing)
  • Workstream (Frontend / Backend / Infra)

Every task after a section declaration belongs to that section until the next section. You can omit sections entirely for short charts, and tasks will render in one lane.

5. Task syntax

Canonical form:

<Task name> :<tags>, <id>, <start>, <duration-or-end>

Tags and ID are optional; <Task name>, start, and duration/end are the minimum. Start can be an absolute date or a dependency on another task.

Forms (all supported)

Form Example When to use
Absolute start + duration Kickoff :2026-01-05, 3d Simple timeline entry
Named + absolute + duration Kickoff :k1, 2026-01-05, 3d You'll reference this task from another
Single-dep + duration Design :d1, after k1, 5d Starts when k1 ends
Multi-dep + duration Build :b1, after d1 r1, 2w Starts after the latest of d1 or r1
Explicit end date Phase :p1, 2026-01-05, 2026-02-01 You know both endpoints
Milestone (absolute) Launch :milestone, 2026-03-01, 0d Zero-duration marker

Duration units

y (years), M (months — capital M, lowercase m means minutes), w (weeks), d (days), h (hours), m (minutes), s (seconds), ms (milliseconds). Decimals are allowed (1.5d).

For most roadmaps, d and w are the right units. Use M and y for multi-year horizons. Use h and m only for intra-day charts (§8).

6. Task tags (states)

Tags go before the id / start, separated by commas. Multiple tags stacked (e.g. :active, crit, t1, …) are supported.

Task name :done, t1, 2026-01-05, 5d
Task name :active, crit, t2, 2026-01-05, 5d
Ship      :milestone, 2026-03-01, 0d

Supported tags:

Tag Meaning Use for
done Completed Showing historical context on a forward-looking roadmap
active In progress at chart's "now" The one or two tasks currently happening
crit Critical path Genuinely critical items — overuse drains the meaning
milestone Zero-duration marker Launches, gates, review points (see §7)

Do not use the vert tag (vertical marker line). The parser accepts it, but our handler deliberately skips it — the task won't render.

7. Milestones

Three equivalent forms — pick whichever fits:

Launch :milestone, 2026-03-01, 0d     // tag + absolute date
Ship   :2026-03-01, 0d                // zero duration is treated as a milestone
Ship   :milestone, after l2, 0d       // tag + after dependency

Milestones render as a single-point marker, not a bar. Keep names short (1–3 words) — the marker is small and long text crowds it.

8. Intra-day charts (time-of-day)

For event schedules and hour-scale timelines, switch dateFormat to HH:mm. Task starts become times-of-day, and the axis auto-switches to hour segments:

gantt
    title Launch day run-of-show
    dateFormat HH:mm
    section Morning
    Team sync :09:00, 30m
    Final QA  :09:30, 1h
    section Afternoon
    Launch window :milestone, 14:00, 0m
    Monitoring :14:00, 3h

Use h and m durations. Don't mix dateFormat YYYY-MM-DD with HH:mm task starts — task starts must match the declared dateFormat or the parser rejects the chart.

9. What's NOT supported

Our renderer is a subset of full Mermaid gantt. The following are silently ignored or actively stripped — don't include them, they waste tokens and can confuse readers who paste the Mermaid elsewhere:

  • classDef, class, any styling — stripped by preprocessing. No colors; the tool description confirms "In gantt charts, do not use color styling."
  • tickInterval, axisFormat — ignored. Axis unit (hour / day / week / month / year) is auto-selected based on total chart duration.
  • excludes, includes, weekend — ignored. Weekends are not skipped; excluded dates are not honored.
  • todayMarker — not rendered.
  • click handlers — FigJam diagrams are static.
  • vert — parsed but not rendered. Tasks tagged vert are silently dropped.
  • Compact mode / YAML settings — ignored.

10. Limitations and gotchas

  • Axis unit is auto-selected. You don't control it directly — it's inferred from the total chart time range. Shorter charts get finer units (hour / day), longer ones get coarser (month / year). Design the date range to get the unit you want.
  • Multi-year charts work. No automatic clamp; you can render 3+ year roadmaps, and the axis will coarsen to year-level segments.
  • Minimum task width is enforced. Very short tasks in a long chart get widened to stay readable; the visual proportion won't match the exact date math.
  • Overlapping tasks stack vertically within a section, not horizontally. ELK-style intelligent packing does not apply here.
  • Task names: keep them short. Long names stretch the left gutter; 2–5 words is the sweet spot.

11. When gantt syntax isn't enough: build a custom timeline instead

Gantt is a great fit for the 80% case: phases, sequenced tasks, milestones, a clean time axis. But the renderer is intentionally narrow, and there's a class of timeline request it can't satisfy — for example:

  • Color-coded phases, tasks, or milestones
  • Annotations, callouts, or sticky notes tied to specific dates
  • Custom icons or images on milestones
  • Dependency arrows drawn between lanes
  • Non-uniform lane heights, or lanes grouped under a header
  • Weekends/holidays visually excluded from the axis
  • Narrative text or diagrams placed alongside the timeline
  • Any styling beyond what Mermaid gantt allows (which is effectively none)

When a user asks for something in this territory, don't stretch the gantt syntax to pretend it supports it — generate_diagram will silently drop or strip the relevant directives and the output will mislead the user.

Instead, build the timeline directly on a FigJam canvas using the use_figma tool. The figma-use and figma-use-figjam skills cover how to: create a new FigJam file, place shapes and connectors, position nodes on a time axis, add sticky notes and annotations, color-code elements, and group content into sections. Load those skills and compose the timeline to the user's actual spec.

Signals it's time to switch from generate_diagram to use_figma:

  • The user's request includes words like "color-code", "annotate", "highlight", "callout", "attach a note", "icon", "group under".
  • The user has already tried generate_diagram once and is asking for refinements the syntax can't express.
  • The user wants a timeline visualization that isn't strictly a gantt — horizontal roadmap swimlanes, a journey map with emotional beats, a dated storyboard, etc.
  • The user has a reference file or mock they want you to match closely, and gantt's auto-layout won't hit it.

Trade-offs worth naming up front: a hand-built FigJam timeline is more flexible but slower to produce, and iterating on it is manual rather than a one-line Mermaid edit. If the user just needs a quick schedule, gantt wins. If they want a presentation-quality timeline with real visual design, use_figma is the right tool.

12. Best practices

  1. One chart per coherent timeframe. A 12-week sprint plan and a 3-year roadmap don't belong in the same chart — different axis units make both look wrong.
  2. Use sections liberally for charts with 8+ tasks. One-lane charts beyond that length become hard to scan.
  3. Name IDs meaningfully when you'll reference them with after. d1, b1 are fine for short charts; design_research, build_api are better for longer ones that you'll iterate on.
  4. Prefer after dependencies over explicit dates when tasks are sequential. If one slips, only the anchor task changes — the rest shift automatically.
  5. Reserve crit for the genuine critical path — items where a slip delays the project. If everything is critical, nothing is.
  6. Keep it under ~25 tasks. Past that, split into phase-specific charts.

13. Validation checklist

Before calling generate_diagram:

  1. dateFormat is declared — YYYY-MM-DD for date charts, HH:mm for intra-day.
  2. The first task has an absolute start (not just after — the chart needs an anchor).
  3. Every after <id> references a task ID defined earlier in the chart.
  4. Task starts match the declared dateFormat (don't mix ISO dates with HH:mm starts).
  5. No classDef, class, style, click, tickInterval, axisFormat, excludes, todayMarker, or vert lines (they'll be stripped or ignored).
  6. Task names are short; IDs are terse but unambiguous.
  7. Milestones use the milestone tag, a zero duration, or both.

14. Complete example

A realistic product-launch roadmap with phases, state tags, dependencies, and a milestone:

gantt
    title Q1 Launch Plan
    dateFormat YYYY-MM-DD
    section Discovery
    User research   :done, r1, 2026-01-05, 2w
    Synthesis       :done, s1, after r1, 1w
    section Design
    Concepts        :active, d1, after s1, 2w
    Design review   :d2, after d1, 3d
    Hi-fi designs   :d3, after d2, 2w
    section Build
    API scaffolding :b1, after d2, 2w
    UI build        :b2, after d3, 3w
    Integration     :b3, after b2, 1w
    section Launch
    Internal beta   :l1, after b3, 1w
    Fixes           :crit, l2, after l1, 5d
    Ship            :milestone, after l2, 0d

15. Calling generate_diagram

Pass:

  • name — a descriptive diagram name
  • mermaidSyntax — your gantt source
  • userIntent (optional) — what the user is trying to accomplish

Do not pass useArchitectureLayoutCode — that's architecture-diagram only.

Source: SKILL.md on GitHub

No alerts16d3 checks · Risk SAFE
  • Gen Agent Trust Hub16d

    The skill provides comprehensive instructions for generating and editing various diagram types in FigJam using Mermaid syntax. It includes specific routing, syntax constraints, and a workflow for enhancing diagrams with additional Figma tools. No malicious behavior or security risks were identified.

  • Socket16d

    No alerts

  • Snyk16d

    Risk: LOW · No issues

Signed by skilld at dd9335f. This ties the file your Agent reads to that commit on GitHub. It does not review the instructions.

Last checked against GitHub yesterday.

Activeupdated 5 months ago
  • figma
  • figjam
  • mermaid
  • diagram
  • flowchart
  • sequence-diagram
  • erd
  • gantt
  • state-diagram
  • architecture

README badge

README badge for figma/mcp-server-guide/figma-generate-diagram

This skill is a prerequisite routing guide that loads before every `generate_diagram` call. It determines whether the request matches a supported diagram type (flowchart, sequence, state, ER, Gantt, architecture), applies universal Mermaid constraints, and decides whether a hybrid workflow with FigJam editing is needed. Use this to avoid rendering failures and low-quality output when generating diagrams from Mermaid syntax.

Generated from the current SKILL.md.

What diagram types does generate_diagram support?
Flowchart, sequence diagram, state diagram, ER diagram, Gantt chart, and architecture flowchart. Pie charts, mindmaps, class diagrams, C4 diagrams, and timelines are not supported.
Do I need to load this skill before calling generate_diagram?
Yes. This skill must be loaded before every generate_diagram tool call. Skipping it causes rendering failures and low-quality output.
Can I use emojis or HTML tags in diagram labels?
No. The tool rejects emojis in any part of the Mermaid source, and HTML tags are not supported in labels. Special characters must be wrapped in quotes.
Can the tool edit existing diagrams — move shapes or change fonts?
No. The tool cannot move individual shapes, change fonts, or edit diagrams node-by-node after generation. For those changes, open the diagram in Figma and edit manually, or regenerate the diagram with new content.
Can I add colors or annotations to Gantt charts and sequence diagrams?
Not directly via Mermaid. Styling (classDef, class) and sequence notes are stripped by preprocessing. Use the hybrid workflow with use_figma to add colors and stickies after generation, or build the timeline directly in Figma if styling is fundamental.

Generated from the current SKILL.md. These answers refresh after source changes.