Expanded Closeout Detail
This advisory reference grants no authoritative GateDecision, PolicySnapshot, evidence sufficiency, or completion authority.
Read this file only when a trigger in SKILL.md applies. It supplies detail to
the one Aegis Impact and Safety Receipt; no card here is a second final owner.
Add only triggered cards and keep untriggered ceremony out.
Readiness Summary
For release, merge, publish, handoff, or "ready?" requests, organize fresh evidence for tests, documentation, version, supported-host compatibility, uncovered scope, and residual risk. Readiness does not authorize commit, tag, publish, merge, or release; report missing authority or evidence explicitly.
Trace Digest
Use only for an explicit audit/debug/release/long-task review or user request.
Summarize the bounded execution and evidence chain, retrieval chain, static
rules and effects, triggered/skipped relevant skills, command/verification
trace, stability/value signals, host capabilities, unavailable fields,
redaction, and confidence. Label claims measured, observed, inferred,
declared, or unknown. Never expose raw chain-of-thought.
Goal Closure
When goal framing or a durable task boundary shaped work, match the claim to the highest proven boundary. For expanded/audited closure show:
Goal Closure:
- Goal status: done | blocked | needs-verification | scope-exceeded
- Success evidence:
- Stop state:
- Non-goals respected:Whole-task, current-task, and slice evidence are distinct; a lower boundary cannot silently satisfy a higher one.
Context Impact
Use only when project/domain semantics changed or were acceptance evidence.
Name affected context/terms, evidence grade, fact-versus-decision authority,
and action. For unchanged, verify no context write occurred. Compose
establishing-project-context for an unresolved semantic delta.
Workspace Integrity
Use only when the target project's configured Aegis workspace was created or
changed, or a work record exists. For a work record, run python <aegis-workspace-helper> bundle --root <target-project-root> --work YYYY-MM-DD-<slug>, then python <aegis-workspace-helper> check --root <target-project-root>. Report work record,
results, target root, and the structural-only boundary: these commands prove
structure, not evidence sufficiency, semantic correctness, or completion.
Baseline and ADR Closure
For product/requirement or durable architecture work, use
docs/current/AEGIS_PROCESS_BASELINE.md §4 (Baseline Roles and Alignment).
For skill-only installs without current docs, use the project's confirmed
requirement and architecture owners with these portable definitions: Design
Defect means the baseline itself is wrong; Implementation Drift means work
deviated from a confirmed correct baseline. Correct the wrong owner, never
rewrite a baseline merely to bless drift. Record:
Baseline Alignment:
- Product / Requirement Baseline:
- Architecture / Runtime Boundary Baseline:
- Result: aligned | Design Defect | Implementation Drift | missing-authority | needs-clarification
- scope: requirements | architecture | bothArchitecture Alignment is the architecture-scoped compatibility alias, not a
second default card.
For completed medium/high durable architecture work, run ADR Backfill Check
against docs/current/AEGIS_ADR_AUTO_BACKFILL.md. If the action is create,
amend, supersede, or baseline sync is needed/unknown, use
recording-architecture-decisions before the final claim.
Governance and Retirement Closure
For governance, cleanup, migration, compatibility, namespace cutover, public release, deprecation, policy boundary, or retirement work, keep this dual track visible even when implementation was small:
Governance Closure:
- Repair Track:
- Retirement Track:
- Residual Risk:When work adds, replaces, retains, or removes old logic, also record the old owner/path found, deleted or retained status, retention reason, retirement trigger, and lingering-reference check. A retained internal owner means bounded mitigation/debt, not clean retirement.
Use anti-entropy-governance to choose delete-first, a proven external
compatibility exception, or confirmation-first. Its decision surface feeds the
receipt; it does not become another completion report.
Destructive-Action Cards
For code retirement, record:
Anti-Entropy Declaration:
- Deletion Class:
- Old Path/Object:
- New Canonical Owner:
- Expected Preserved Behavior:
- Expected Retired Behavior:
- External Boundary Touched: no | yes
- Source-of-Truth Data Risk: none | possible | confirmed
- User Confirmation Required: no | yesFor external-unknown code, a generic original deletion request does not satisfy scoped confirmation. An existing user instruction counts only if it explicitly accepts the concrete external risk and authorizes the exact retirement scope; otherwise disclose the risk and request scoped confirmation before editing.
If the target is persistent state or another irreversible source-of-truth object, use confirmation-first and stop at:
Data Destruction Guard:
- Target Class:
- Exact Target(s):
- Environment:
- Why Irreversible:
- Backup / Rollback Note:
- Allowed Read-Only Next Steps:
- Blocked Destructive Steps:
- Confirmation Required: yes
- Status: awaiting scoped confirmationBroad assent such as "OK", "continue", or "sounds good" is not scoped confirmation. If scope changes, request fresh confirmation. Until then, only read-only analysis is allowed and the closeout status remains incomplete.
Expanded Complexity Detail
When complexity pressure is material, state Complexity Delta, Complexity Closure,
Completion-Time Complexity Repair Decision, Complexity Governance Suggestion,
or Major Complexity Alert as applicable. Maintained test source
is not a cheap tests-only exception. Pair new fallback/adapter/compatibility
logic with the retirement evidence above.