Job Map Express — method KB (skill-only)
Minimal method needed to run maps in chat. No consulting playbooks, no inversion strategy, no survey engines.
Critical distinction
Job phases ≠ job steps.
- Phases are a universal MECE frame (Define → Conclude). They classify and check coverage.
- Steps are the chronological actions for this job. Fidelity sets how many steps you write.
- Never emit one step per phase by default. That collapses the frame into a fake 9-step map.
- A phase may contain zero, one, or many steps. Tag each step with its phase. Ensure the map’s steps, read in order, still make the job MECE for this scenario.
- If a phase has zero steps, that is allowed only when
start_point/end_pointor the job scope truly excludes that phase — say so explicitly. Do not invent filler steps just to “hit” a phase.
1. Scenario inputs
| Field | Required | Rule |
|---|---|---|
job |
yes | [Verb] + [Object] + [Contextual clarifier]. What the person is trying to accomplish — not a product or project name. |
end_user |
yes | One human role (Job Executor). Never a company, demographic, or department-as-actor. |
focus |
no (default NA) | B2C | B2B | NA. Default to NA unless the user sets otherwise. |
fidelity |
yes | low (5–8 steps) | med (8–14) | high (14–20). Step count, not phase count. |
context |
no | Setting constraints (industry, channel, regulation). |
start_point / end_point |
no | Optional map boundaries. |
Missing inputs: stop and ask in short batches (2–4 questions). Never invent job, end_user, or fidelity. Default focus to NA when omitted.
Solution-shaped job: if they name a tool/vendor, ask what outcome they are trying to get done until job is solution-agnostic; confirm the reframed job before mapping.
2. Phases (coverage frame — not the map)
Use these labels to tag steps and audit gaps:
- Define — define, plan, or assess what must be known upfront
- Locate — locate/gather/access resources (tangible or intangible)
- Prepare — prepare or integrate inputs/environment
- Confirm — verify, prioritize, or decide before execution
- Execute — core action(s) that get the job done
- Monitor — monitor during execution
- Resolve — fix deviations / failures
- Modify — adjust based on monitor/resolve
- Conclude — finish and wrap up
3. Steps (the actual job map)
- Choose step count from fidelity (low 5–8, med 8–14, high 14–20).
- Write chronological steps for this
job/end_user/context. - Each step: verb-led
name, shortdescriptionof what (not how/tool), onephasetag. - Dense phases (often Execute, Resolve) may need several steps; quiet phases may need none or one.
- After drafting, audit: reading only the steps, is the job complete and MECE? Any phase gap that the job actually requires?
- Respect
start_point/end_pointif set.
4. Success metrics (outcomes)
PJTBD outcome syntax only:
[Minimize|Increase] + [metric] + **[object of control]** + [contextual clarifier]
- Object of control in bold
- Objective voice (no “you” / “the customer”)
- Solution-agnostic
- Attach metrics to steps, not to phases
- Ask: all steps or one step
Do not use public “When … I want to … so I can …” statement templates.
5. Optional (only if asked)
- Root causes for a named metric (several causes; no fake survey math)
- Solution approaches for a step/metric — labeled as approaches, not as the job map
6. Hard rejects
- Map without required Scenario fields
- Non-human Job Executor
- Solution/vendor language in job or steps
- One-step-per-phase autopilot (especially a forced 9-step map)
- Filler steps added only to populate empty phases
- Step count outside fidelity band without user override
- Vague verbs: manage, facilitate, empower, enable, ensure, oversee
7. Tiny EXAMPLE (synthetic) — low fidelity, NOT 1:1 phases
- end_user:
Plant reliability engineer - job:
Qualify a replacement sensor package for a sour-gas service envelope - focus:
B2B· fidelity:low(7 steps)
- Define — Lock the combined operating envelope and certification obligations.
- Locate — Gather applicable standards and prior certificate packs for the service.
- Prepare — Build the constraint sheet from envelope + cert inputs.
- Confirm — Decide go/no-go scope against site and insurance rules.
- Execute — Specify the replacement configuration against the locked envelope.
- Resolve — Clear mismatches between offered configuration and envelope requirements.
- Conclude — Close acceptance with traceability artifacts for install and audit.
(Monitor/Modify have no dedicated steps here — scope didn’t require separate actions; Execute absorbs in-flight checks as description detail. That is intentional, not an error.)
Sample Execute metric: Minimize the likelihood of specifying **wetted materials** that fail the sour-service obligation
Synthetic only — not evidence.