All skills
simota avatar

/launch

@e307415
by shingo imotasimota/agent-skills85 stars
15

Planning releases and reporting delivery work from GitHub PR history. Use when versioning, CHANGELOGs, rollout or rollback plans, engineering metrics, retrospectives, or stakeholder reports are needed.

Use this Skill: https://skilld.dev/gh/simota/agent-skills/launch

This session only. Nothing lands on disk.

referencestrategies.md

≈2.3k tokens on demand. Your agent reads this file only when SKILL.md points to it.

Launch Release Strategies

Purpose: Use this file when you need versioning rules, CHANGELOG and release-note structure, rollback options, rollout defaults, hotfix flow, or release-window guidance.

Contents

  1. Versioning strategies
  2. CHANGELOG rules
  3. Release notes
  4. Rollback options
  5. Feature flag strategy
  6. Release checklist and Go/No-Go
  7. Hotfix workflow
  8. Release windows and cadence
  9. Git and GitHub commands

1. Versioning Strategies

Semantic Versioning

MAJOR.MINOR.PATCH

  • MAJOR: breaking changes
  • MINOR: backwards-compatible features
  • PATCH: backwards-compatible fixes
Change type Version bump Example
Breaking API change MAJOR 1.4.2 -> 2.0.0
New feature MINOR 1.4.2 -> 1.5.0
Bug fix PATCH 1.4.2 -> 1.4.3
Security fix PATCH 1.4.2 -> 1.4.3
Dependency update PATCH or MINOR depends on impact
Documentation only none no release bump required

Pre-release labels

Label Use for
alpha early development
beta feature complete, test-heavy
rc release candidate

Guardrails:

  • Keep rc windows under 2 weeks.
  • If alpha or beta exceeds 1 month, recommend stabilizing or canceling the channel.

CalVer

Use CalVer when time-based releases or continuous delivery make strict SemVer noisy.

Examples:

  • YYYY.MM.DD -> 2026.03.06
  • YYYY.MM.MICRO -> 2026.03.3
  • YY.MM -> 26.03

Recommended fit:

Project type Preferred strategy
OSS library SemVer
SaaS with frequent deployment CalVer or automated build numbering
Mobile app SemVer plus build number
Internal tool CalVer
Public API URI/API version + SemVer

2. CHANGELOG Rules

Use Keep a Changelog categories:

Category Use for
Added new features
Changed behavior changes
Deprecated soon-to-be removed features
Removed removed behavior
Fixed bug fixes
Security security work

Commit mapping:

Commit type CHANGELOG category
feat Added
fix Fixed
security Security
perf Changed
refactor Changed
deprecate Deprecated
remove Removed
docs skip unless user-facing and significant
chore skip
test skip
ci skip

3. Release Notes

Release notes are user-facing. CHANGELOG is developer-facing.

Aspect Release notes CHANGELOG
Audience end users / stakeholders developers
Tone plain language technical
Focus benefits and impact exact change list
Timing per release continuous record

Minimum release notes content:

  • release version and date
  • highlights
  • user-visible changes
  • fixes and security changes worth calling out
  • migration / caution notes if relevant

4. Rollback Options

Default rollback trigger:

  • error_rate > 5% for 5 minutes

Preferred rollback methods:

Method Typical command shape Time Risk
Disable feature flag API or dashboard toggle < 1 minute Low
Roll back deployment kubectl rollout undo ... 2-5 minutes Low
Revert config config rollback 1-3 minutes Low
Reverse DB migration migration rollback 5-15 minutes Medium
Restore backup backup / restore 15-60 minutes High

Post-rollback actions:

  • notify stakeholders
  • create incident record
  • schedule postmortem
  • tag or document the rolled-back version

5. Feature Flag Strategy

Flag types

Type Purpose Example
Release Flag hide incomplete features enable-new-checkout
Ops Flag emergency switch / circuit breaker disable-cache-v2
Experiment Flag controlled test pricing-v3-experiment
Permission Flag user segmentation beta-users-only

Rollout default

5% -> 25% -> 50% -> 100%

Minimum rollout requirements:

  • canary size at least 5%
  • canary duration at least 24 hours
  • explicit success criteria
  • explicit rollback conditions

Flag lifecycle

Phase Required fields
CREATE owner, purpose, type, expiry, fallback, cleanup ticket
ROLLOUT stages, success criteria, rollback trigger
STABLE 100% reached, side effects checked, metrics stable
CLEANUP code removal PR created, tests updated
REMOVED code and flag-service cleanup complete

6. Release Checklist And Go/No-Go

Minimum gate set:

  • all relevant tests passing
  • security scan passing
  • staging verification complete
  • rollback plan available
  • CHANGELOG complete
  • stakeholder approval if required
  • on-call or incident coverage ready
  • release window acceptable
  • code coverage > 80%

Go/No-Go logic:

  • GO only if all mandatory gates pass
  • NO-GO if any mandatory blocker remains
  • preferred gates can warn, but do not override mandatory blockers

7. Hotfix Workflow

Use a hotfix when production impact is critical and waiting for the next planned release is unacceptable.

Typical flow:

  1. Create a hotfix branch from the affected release tag.
  2. Apply the smallest possible fix.
  3. Get expedited review.
  4. Deploy with reduced ceremony but not without rollback.
  5. Tag the hotfix.
  6. Cherry-pick or merge the fix back to the mainline.

Suggested branch naming:

  • hotfix/v1.2.1

8. Release Windows And Cadence

Preferred windows:

  • Tuesday to Thursday
  • business hours with support coverage

Avoid:

  • Friday releases without explicit approval
  • low-staff windows
  • major freeze periods without approval

Cadence rule:

  • Prefer at least one release per week to avoid oversized batches.

9. Git And GitHub Commands

Release branch

git checkout -b release/v1.2.0 main

Hotfix from tag

git checkout -b hotfix/v1.2.1 v1.2.0

CHANGELOG input

git log v1.1.0..HEAD --oneline --no-merges

Release creation

gh release create v1.2.0 --notes-file releases/v1.2.0.md

Critical Decision Rules Long Form (SKILL.md excerpt)

Area Rule
Go/No-Go Use a scored checklist (each criterion 1.0 = met, 0.5 = partial, 0 = unmet; threshold ≥ 80%). Required criteria: tests green, security scan clean (Sentinel), staging verification, rollback plan tested, failover mechanisms verified (fewer than 1 in 3 organizations test failover regularly — State of Resilience 2025), CHANGELOG generated, load test at ≥ 2× expected peak with < 5% error rate, SLO baselines captured (Beacon), and stakeholder approval when needed. For AI-agent-facing services, include correlated-burst load tests — traditional load tests miss AI-era traffic patterns where thousands of agents simultaneously hammer the same endpoints. Code coverage above 80% unless the project has a stronger local standard. Track DORA metrics (5 core + Reliability) as release health indicators: target Change Failure Rate < 15% (elite benchmark per DORA 2025: 0-2%, achieved by ~8.5% of teams), Failed Deployment Recovery Time (FDRT) < 1 hour, and Rework Rate (unplanned fix deployments / total deployments) < 15%. When a release includes significant AI-generated code, add explicit verification gates — DORA 2025 research shows AI adoption improves throughput 30-40% but increases change failure rate 15-25%.
Rollback Define automated rollback triggers before deploy — manual undoing is an anti-pattern. Baseline trigger: error_rate > 5% for 5 min OR P99 latency > baseline + 50% for 5 min. Preferred methods: flag disable < 1 min, deployment rollback 2-5 min, DB rollback 5-15 min, data restore 15-60 min. Always include DB rollback scripts or forward-compatible migration patterns. For Kubernetes, use Flagger (wraps standard Deployments with zero manifest changes, fully automated canary lifecycle) or Argo Rollouts (requires Rollout kind replacing Deployment, provides explicit control with UI dashboard) for automated progressive delivery with metric-driven rollback; prefer Gateway API for traffic splitting (SMI project merged into Gateway API subproject). Conduct rollback drills quarterly or before major releases.
Feature flags Ring-based rollout: Internal team (5-20 people, 24-48h) → Canary 1-5% (error rate < 0.1%) → Beta 10-25% (user feedback) → GA 100% (7-day stability). Minimum canary duration 24 hours. Nesting depth 1. Approval if active flags exceed 50. Stale release flag cleanup after 60 days. Create a cleanup ticket when creating the flag — removal as part of definition of done prevents flag debt accumulation. Define success metrics before enabling each flag. Use sticky sessions during progressive delivery so users consistently see either the stable or canary version — session switching causes confusing UX and corrupts canary metrics. For AI-driven canary analysis, tools like Argo Rollouts and Harness can dynamically adjust rollout pace based on real-time error/latency signals.

Source: SKILL.md on GitHub

2 warnings13d5 checks · Risk SAFE
  • Gen Agent Trust Hub13d

    The skill is primarily focused on release reporting and orchestration. It processes external data from GitHub, presenting a standard indirect prompt injection surface. All command execution and external asset loading are within the scope of its documented functionality.

  • Socket13d

    No alerts

  • Snyk13d

    Risk: MEDIUM · 1 issue

  • Runlayer6mo

    2/8 files flagged

  • ZeroLeaks5mo

    Score: 93/100 · 2 sections analyzed

Signed by skilld at e307415. This ties the file your Agent reads to that commit on GitHub. It does not review the instructions.

Last checked against GitHub 2 days ago.

Activeupdated 2 weeks ago

README badge

README badge for simota/agent-skills/launch