All skills
deanpeters avatar

/pol-probe

@b68bf96

Define a Proof of Life probe to test a risky hypothesis cheaply. Use when you need harsh truth before building real product.

Use this Skill: https://skilld.dev/gh/deanpeters/product-manager-skills/pol-probe

This session only. Nothing lands on disk.

examplessample.md

≈1.2k tokens on demand. Your agent reads this file only when SKILL.md points to it.

PoL Probe Examples

✅ Good: Task-Focused PoL Probe

Hypothesis: "Users can distinguish between 'archive' and 'delete' without a confirmation modal."

Probe Type: Task-Focused Test Method: UsabilityHub 5-second test with 20 users Timeline: 2 days (build task, recruit, analyze) Success Criteria:

  • Pass: 80%+ users correctly identify action consequences
  • Fail: <60% correct, or 3+ users express confusion

Harsh Truth Delivered: Only 45% understood the difference. Added explicit labels ("Delete forever" vs "Archive for 30 days"). Re-tested at 92%. Probe deleted.

Why This Works:

  • Narrow hypothesis (one UI decision)
  • Fast execution (2 days)
  • Brutal honesty (failed first attempt)
  • Disposable (deleted after learning)

✅ Good: Feasibility Check PoL Probe

Hypothesis: "We can auto-generate meeting summaries from Zoom transcripts using GPT-4 with <2% error rate."

Probe Type: Feasibility Check Method: 1-day spike with 10 real transcripts, GenAI prompt chain Timeline: 1 day Success Criteria:

  • Pass: 9/10 summaries accurate, <5 manual edits per summary
  • Fail: >3 summaries require full rewrites

Harsh Truth Delivered: Error rate was 18%. Discovered that medical jargon and crosstalk broke the model. Decided NOT to build feature. Probe deleted.

Why This Works:

  • Eliminated technical risk before building
  • Cheap (1 day)
  • Falsifiable (clear error threshold)
  • Saved months of wasted development

❌ Bad: "Prototype Theater" (Not a PoL Probe)

Hypothesis: "Executives will approve budget if we show a polished demo."

Probe Type: (None—this isn't a probe) Method: 3-week Figma design + coded prototype with animations Timeline: 3 weeks Success Criteria: "Get exec buy-in"

Why This Fails:

  • Not testing a user hypothesis (testing internal politics)
  • Too polished (3 weeks = not disposable)
  • No harsh truth (vanity metrics: "Execs liked it!")
  • No clear disposal plan (became "the prototype we have to maintain")

What Should Have Been Done:

  • Skip the prototype entirely
  • Use a Narrative Prototype (Loom walkthrough in 1 day)
  • Test with 5 target users, not executives
  • Measure task completion, not stakeholder applause

❌ Bad: MVP Disguised as PoL Probe

Hypothesis: "Users will subscribe to our AI writing assistant."

Probe Type: Vibe-Coded PoL Probe (claimed) Method: Fully functional React app with Stripe integration Timeline: 4 weeks Success Criteria: "10 paying customers"

Why This Fails:

  • Not disposable (4 weeks of work, payment processing—too invested)
  • Too broad ("will subscribe" tests price, value prop, UX, and onboarding simultaneously)
  • This is an MVP, not a probe
  • No disposal plan (team will resist deleting working code)

What Should Have Been Done:

  • Test value prop with a Narrative Prototype (explainer video, measure interest)
  • Test pricing with a landing page + waitlist (ConvertKit, Carrd)
  • Test core AI quality with a Feasibility Check (1-day spike)
  • Build MVP only after all three probes pass

Common Pitfalls

1. Prototype Theater

Failure Mode: Building impressive demos that don't test hypotheses.

Consequence: Waste weeks impressing stakeholders while learning nothing about users.

Fix: Before building, write down: "What harsh truth am I seeking? What would prove me wrong?"


2. Confusing PoL with MVP

Failure Mode: Treating probes as "version 1.0" instead of disposable experiments.

Consequence: Scope creep, technical debt, resistance to disposal.

Fix: Set a disposal date before you start. If you can't commit to deleting it, you're building an MVP, not a probe.


3. Choosing Based on Tooling Comfort

Failure Mode: "I know Figma, so I'll design a prototype" (regardless of whether design is the risk).

Consequence: Validate the wrong thing; miss the actual risk.

Fix: Match probe type to hypothesis, not your skillset. If you need a Feasibility Check but only know design tools, pair with an engineer for 1 day.


4. Vanity Metrics

Failure Mode: Measuring "stakeholder excitement" instead of user behavior.

Consequence: False confidence; ship something users don't want.

Fix: Define success criteria as observable user behavior (task completion rate, error rate, time-on-task), not opinions.


5. No Disposal Plan

Failure Mode: "We'll figure out what to do with it later."

Consequence: Probe becomes technical debt, "temporary" code ships to production.

Fix: Document disposal date and method before building. Treat it like a spike in Agile—timeboxed and deleted by design.


Source: SKILL.md on GitHub

1 warning17d5 checks · Risk SAFE
  • Gen Agent Trust Hub17d

    No security issues detected. The skill is purely instructional, providing templates and frameworks for documenting product validation experiments (Proof of Life probes) without any executable code, scripts, or network operations.

  • Socket17d

    No alerts

  • Snyk17d

    Risk: LOW · No issues

  • Runlayer7mo

    3/3 files flagged

  • ZeroLeaks5mo

    Score: 93/100 · 2 sections analyzed

Signed by skilld at b68bf96. This ties the file your Agent reads to that commit on GitHub. It does not review the instructions.

Last checked against GitHub last month.

Activeupdated 2 months ago
argument-hint
[hypothesis to test]
type
component
theme
validation-experiments
Other metadata
intent
Define and document a **Proof of Life (PoL) probe**—a lightweight, disposable validation artifact designed to surface harsh truths before expensive development. Use this when you need to eliminate a specific risk or test a narrow hypothesis **without building production-quality software**. PoL probes are reconnaissance missions, not MVPs—they're meant to be deleted, not scaled.
best_for
[
  "Documenting a lightweight validation artifact before build",
  "Testing a narrow hypothesis without shipping production software",
  "Reducing risk before spending engineering time"
]
scenarios
[
  "Define a Proof of Life probe for a new workflow automation idea",
  "Help me write a PoL probe for this pricing hypothesis",
  "Create a low-cost validation probe before we build this feature"
]
estimated_time
15-25 min

README badge

README badge for deanpeters/product-manager-skills/pol-probe