Release Readiness Template
Unconfirmed items are [NEEDS SOURCE] or "not confirmed", never assumed done.
1. The release
What is shipping: · What does not change: · Reaches (accounts / units): · Reversibility: Level: [1 Light / 2 Standard / 3 Heavy] because [reach and reversibility]. A lighter level would leave [uncovered].
2. The seven checks
| Check | State | Evidence | Owner |
|---|---|---|---|
| 1. What changes (and doesn't) | |||
| 2. Tested: what, where, what was not tested | |||
| 3. Rollout stages and move-on criteria | |||
| 4. Monitoring: signals, watcher, duration | |||
| 5. Rollback: method, time, rehearsed? | |||
| 6. Support and customer communication | |||
| 7. Dependencies and timing (why now) |
3. Go / hold criteria (agreed before the status)
| # | Criterion | Threshold | Must-pass or Watch | Result |
|---|
4. Decision
Go / Hold / Go with conditions: · Decided by (one person): · Conditions: Open items: [owner, date]
Quality checks
- Level is justified by reach and reversibility
- Rollback is named, timed, and rehearsed (or its absence is flagged)
- Rollout is staged with criteria
- Monitoring has named signals and a named watcher
- Go/hold criteria were written before the status
- One person decides
- Why-now is justified