Stakeholder Mapping Example — Industrial

Initiative: Northfield Automation's remote firmware update for the NFA-500.

Continues from the stakeholder-identification industrial example, which surfaced plant OT security as a Permission-holder at every site.


Grid 1: Power × Interest

High Interest Low Interest
High Power Manage closely<br>· Northfield VP Engineering<br>· Plant operations managers Keep satisfied<br>· Regulatory (UL/CE)<br>· Northfield CFO
Low Power Keep informed<br>· Northfield field service<br>· Channel partners Monitor<br>· Plant OT security<br>· Plant maintenance staff<br>· Plant safety officers

Read alone: co-design with ops managers and engineering, brief Regulatory, inform field service and partners, ignore the rest.


Grid 2: Impact × Power

High Power Low Power
High Impact Q2<br>· Plant operations managers<br>· Plant OT security<br>· Channel partners Q1 — elevate deliberately<br>· Plant maintenance staff<br>· Plant safety officers
Low Impact Q4<br>· Northfield CFO<br>· Regulatory (UL/CE) Q3<br>· Notification/telemetry vendor

The comparison

Stakeholder Power×Interest Impact×Power Tension
Plant OT security Monitor Q2 Holds Permission at every site and is deeply affected. Low expressed interest only because they haven't been told a network ingress is coming
Plant maintenance staff Monitor Q1 A controller on their line changes state remotely; they stand at the panel when it goes wrong, with no say in enrollment
Plant safety officers Monitor Q1 Own the incident review if an update contributes to an unplanned stop
Regulatory Keep satisfied Q4 High power, low impact — a gate, and correctly treated as one
Channel partners Keep informed Q2 Higher stakes than grid 1 suggests: the feature removes billable site visits

Q1 and misplaced-Q2 voices to elevate:

  • Plant OT security — the most consequential correction. Four conversations across pilot sites before the design is fixed, on what network path, authentication, and audit evidence they would require. They can refuse silently, site by site, and you'd never see a single "no."
  • Plant maintenance staff — what they need to trust a remote change: notification, veto, rollback visibility.
  • Plant safety officers — what evidence they'd need in an incident review.

The mismatch that matters most: plant OT security. Grid 1 puts them in Monitor — low power, low interest. Grid 2 puts them in Q2, high impact and high power, because they hold Permission at every site. Acting on grid 1 alone would have shipped a feature that quietly fails to be adoptable, one refused network request at a time, with no visible rejection anywhere.


Engagement plan

Stakeholder Quadrant Engagement Cadence Owner
Plant OT security Q2 Design consultation on network path and audit evidence 4 sessions pre-spec PM + Eng lead
Plant maintenance staff Q1 Interviews, then review of the notification/veto design Twice pre-launch PM
Plant safety officers Q1 Review of the incident-evidence trail Once pre-launch PM
Plant operations managers Q2 Co-design, pilot cohort Biweekly PM
Channel partners Q2 Commercial conversation on service-revenue impact Monthly Channel lead
Regulatory Q4 Listing impact assessment At spec, at launch Regulatory

Quadrant migration

Stakeholder From To Why How
Plant OT security Monitor (P×I) Manage closely They are a silent veto at every site; involving them early converts a blocker into a specification Bring them into design before the network path is fixed, and give them the audit evidence they ask for
Channel partners Keep informed Manage closely The feature removes billable visits; unaddressed, they slow adoption at accounts they service Commercial conversation about what replaces that revenue, before launch, not after

What to notice

  • The most dangerous stakeholder was in Monitor. OT security has no interest in your product and absolute authority over whether it can reach a plant. A single grid puts them last; the comparison puts them first.
  • A silent veto is worse than a loud one. OT security doesn't escalate — they decline a firewall change. Adoption just never materializes, and nobody can point at a rejection. That's what makes the mismatch expensive rather than merely wrong.
  • Channel partners moved quadrants for commercial reasons, not process ones. The feature removes revenue they currently earn. The engagement is a commercial conversation, not a briefing.
  • Q1 here is about consequence, not convenience. Maintenance staff and safety officers absorb the risk of a remote change to equipment they're responsible for. Neither has a vote in enrollment.
  • The same pattern as the SaaS example, different stakes. Both initiatives put the most affected, least powerful group in Monitor on the first grid. Running the second grid is what corrected it in both cases — which suggests the mismatch is structural, not a one-off oversight.

Source: SKILL.md on GitHub

No alerts1mo3 checks · Risk SAFE
  • Gen Agent Trust Hub1mo

    The stakeholder-mapping skill is a purely instructional tool designed to help project managers prioritize stakeholders. It contains only documentation and templates, with no executable code, network operations, or security risks detected.

  • Socket1mo

    No alerts

  • Snyk1mo

    Risk: LOW · No issues

Signed by skilld at b68bf96. This ties the file your Agent reads to that commit on GitHub. It does not review the instructions.

Last checked against GitHub last month.

Activeupdated 2 months ago
argument-hint
[stakeholder list or initiative]
type
component
theme
stakeholder-comms
Other metadata
intent
Run two complementary 2x2 grids — Power × Interest (sets engagement strategy per stakeholder) and Impact × Power (surfaces who bears consequences but lacks voice) — then compare outputs to reveal blind spots and plan quadrant migration. The grids answer different questions and neither one alone is sufficient: Power × Interest tells you how to engage; Impact × Power tells you whose voice to elevate. Feed outputs into stakeholder-engagement-advisor for per-stakeholder action planning.
best_for
[
  "After stakeholder identification, when you need to decide who gets which level of engagement",
  "Preparing an engagement plan before a roadmap review where executives and impacted user groups have conflicting authority",
  "Surfacing high-impact, low-power user segments who deserve more voice in product decisions but lack org pull",
  "Re-baselining stakeholder strategy after a reorg has shifted who holds decision authority",
  "Planning a compliance or regulatory initiative where power to block sits separately from who bears the consequences"
]
scenarios
[
  "Who should I prioritize engaging on this initiative?",
  "How do I handle stakeholders with conflicting priorities?",
  "Help me figure out whose voice is missing from our roadmap decisions",
  "I need a stakeholder engagement strategy before our quarterly review"
]
sources
[
  "MITRE Innovation Toolkit — Stakeholder Map & Matrix: https://itk.mitre.org/toolkit-tools/stakeholder-map-and-matrix/",
  "MITRE Innovation Toolkit — Stakeholder Power Categories: https://itk.mitre.org/toolkit-tools/stakeholder-power-categories/"
]
estimated_time
25-40 min

README badge

README badge for deanpeters/product-manager-skills/stakeholder-mapping