Choosing what to count
| What the user relies on | Eligible unit | Evidence that the unit was good |
|---|---|---|
| Interactive operation | One intended attempt | The user received the correct usable result by the agreed deadline. Separate availability and latency if the owner needs independent budgets. |
| Daily report | One scheduled delivery per intended recipient or dataset | The report was readable at the promised location by the cutoff, with input data through the agreed time. Specify timezone and business calendar. |
| Streaming pipeline | One expected source record | Its correct result became visible downstream within the latency bound. Count from input acceptance or a reconciled source manifest so dropped records remain visible. |
| Read freshness | One eligible read | The returned data satisfied the user's maximum tolerated age. Specify whether age is measured from source event time or ingestion time. |
| Degraded response | One eligible operation | The response retained the required capability. A successful transport response can still carry an unusable fallback. |
Deadline example. A daily export ran 29 times in a month with 30 scheduled deliveries. All 29 jobs finished on time. A scheduler-success metric reports 100%. If one delivery was missing and all others were readable by cutoff, delivery attainment was 29/30. With so few opportunities, show the effect of one miss before proposing a target.
Window boundaries. Assign each event to a window by a stated rule, such as attempt start time. Allow its outcome deadline and telemetry lag to elapse before final classification. Report incomplete recent windows as provisional.
Recovery. If the question concerns a disaster, record acceptable restoration time (RTO) and acceptable data loss expressed in time (RPO) separately from routine service attainment. An availability ratio alone cannot show whether restored data is current enough.