Measurement checks for an SLO review
Some outcomes are missing
Establish the number of eligible events independently of the outcome collector, for the same population and a window whose deadlines have elapsed. For N eligible events, let G be confirmed good, B confirmed bad, and U unresolved, with G + B + U = N. Each event belongs to exactly one group. For N greater than zero, attainment lies between G/N and (G + U)/N inclusive.
For a target of at least T, the objective was met if the lower bound reaches T and missed if the upper bound falls below T. Otherwise the outcome remains unresolved. Compare before rounding. For example, with 10,000 starts, 15 confirmed bad outcomes and 100 unresolved, even the best case is 99.85%. A 99.9% objective was missed. If the start count also has gaps, identify an independent ledger or a defensible bound on missing starts before claiming a whole-population percentage.
There are few opportunities to fail
Compare targets over the agreed calendar or rolling window using actual eligible volume. For 30 expected deliveries, 99% and 99.9% both allow zero misses. If one miss is acceptable, a count objective such as “at most one late delivery in each 30 scheduled deliveries” expresses that decision exactly. An owner who needs each payroll delivery on time may choose a different objective. Check holidays, cutoff timezone, and whether a longer window would hide a consequential delay.
Impact concentrates in one population
Calculate the promised overall ratio by summing counts. When a commitment, incident, or customer report identifies a region, client, or tier, also show its good and eligible counts. With 99,950 successful desktop attempts and 50 failed mobile attempts, the combined result is 99.95% and the mobile result is 0/50. State whether the actual agreement applies globally or to each client. A cohort failure warrants investigation even when the global objective was met. A separate commitment needs its own owner decision and enough traffic for the proposed window.