Nexus Enact Recipe Reference

Purpose: Read an existing Charter, construct the team from its roster, and orchestrate every work package end-to-end until the work is shipped. Enact is the execution half of the charter → enact pair. Read when: User invokes /nexus enact, or asks to "run the Charter", "build the team from the instruction document and execute it", or "execute docs/CHARTER.md start to finish". For authoring the Charter, see reference/charter-recipe.md.

Contents

  • Overview
  • Input: the Charter contract
  • Invocation Modes
  • Topology
  • Phase 1: Team Construction
  • ★ Confirm Gate
  • Run-to-Completion Contract (enforced)
  • Run Log (append-only)
  • Phase 2: End-to-End Orchestration
  • Phase 3: Verify & Deliver
  • Conditional Inclusion
  • AUTORUN Chain Template
  • Failure Escalation
  • Cost and Latency Profile

Overview

Enact turns a Charter into shipped work. It does no analysis and no planning — the Charter (authored by charter, or hand-written to the same schema) is the complete source of truth. Enact:

  1. Constructs the team strictly from Charter §5 (roster) — resolving each role→skill→spawn config and verifying spawn prereqs. The team is a pure function of the document, so re-running enact on the same Charter rebuilds the identical team.
  2. Orchestrates Charter §4 (work breakdown) via the §6 plan — spawning each work package's owner, running build loops via Orbit, enforcing guardrails, and aggregating hub-spoke.
  3. Verifies & delivers against §7 (verification plan). Throughout, the orchestrator appends every progress event to a dedicated append-only run-log file (see Run Log) and keeps Charter §9 as a summary + pointer into it — so the run is auditable and resumable even if interrupted mid-stream.

Because authoring is already paid for, enact is opt-in and explicit: it spawns the full execution team and writes code, so it announces before building (the ★ Confirm Gate).

Enact runs to completion by default. Once launched under AUTORUN_FULL, enact does not stop mid-run for progress confirmation, recoverable failures, or cost — it drives every §4 work package to a terminal state and only then delivers. The only intentional stops are the safety red lines (Charter §8 human-confirm triggers: L4 security, destructive/irreversible actions, out-of-scope changes) and an unsatisfiable precondition (no valid Charter). See Run-to-Completion Contract. Forcing completion means "do not stop early", never "mask failures" — a completed run can still deliver FAILED/PARTIAL package statuses, reported honestly.

Input: the Charter contract

Enact requires a Charter conforming to the schema in reference/charter-recipe.md § Charter Document Schema. It reads:

Section Used by For
§3 Conventions & Guardrails all phases commit/test/lint/build commands, branch policy, L4 rules
§4 Work Breakdown Phase 2 atomic steps, dependencies, sequencing, per-package AC
§5 Team Roster Phase 1 owner skill + model tier + engine + spawn config per package
§6 Orchestration Plan Phase 2 chain order, parallel branches + file ownership, checkpoints
§7 Verification Plan Phase 3 per-package + final gates
§8 Escalation & Rollback all phases failure tiers, circuit breaker, rollback boundaries
§9 Execution Log Phase 2-3 run-log pointer + final summary; the detailed timeline lives in the append-only run-log file (see Run Log), from whose tail resume restarts
§10 Checklists & Trackers all phases pre-flight gate (Phase 1), per-package DoD (terminal-state criterion, Phase 2), progress tracker (ticked at PKG_DONE), final delivery checklist (Phase 3)

The machine-readable companion (CHARTER.roster.yaml) is preferred for §5-§6 when present. If the Charter is missing a required section or a roster entry names a non-existent skill, enact stops at Phase 1 and reports the gap rather than improvising (the missing design belongs in charter, not here).

Invocation Modes

Form Behavior
/nexus enact (no args) Read docs/CHARTER.md (default), construct + run to completion.
/nexus enact <path> Read the Charter at <path>, construct + run to completion.
/nexus enact dry-run Phase 1 only — construct + verify the team, report constructability, do not execute.
/nexus enact resume Resume from the run-log tail (last terminal package); skips completed packages. Run-to-completion still applies.
/nexus enact log=<path> Override the run-log file path. Default: derived from the Charter path (docs/CHARTER.md → docs/CHARTER.run.log.md).

Run-to-completion is the default and enforced behavior under AUTORUN_FULL. To re-introduce intermediate stops, drop to a confirming mode: ## NEXUS_GUIDED (confirm at phase boundaries) or ## NEXUS_INTERACTIVE (confirm every step). These are the only opt-outs; there is no per-package "pause and ask" inside AUTORUN_FULL.

Topology

Three phases in sequence — Phase 1 Team Construction → ★ Confirm Gate → Phase 2 End-to-End Orchestration → Phase 3 Verify & Deliver — each detailed in its own section below (full step sequence, not repeated here). Every progress event streams to the append-only run log docs/CHARTER.run.log.md, mirrored as a pointer + summary in Charter §9; failure escalation (per Charter §8) loops back into Phase 2 rather than halting.

Hub-and-spoke is preserved: Nexus is the only top-level orchestrator. Where Charter §5 nominates a sub-orchestrator (Vision for UX clusters, Orbit for build loops, Rally for parallel sessions), Nexus spawns it as a ≤7-specialist sub-hub — never agent-to-agent.

Under AUTORUN_FULL the ★ Confirm box is announce-and-proceed (no human stop), and the Failure-escalation arrow loops back into Phase 2 to recover and continue rather than halting — the run only exits at DELIVER or a §8 safety red line (see Run-to-Completion Contract).

Phase 1: Team Construction

Instantiate the team strictly from Charter §5. This is "build the dev team from the Charter".

Step Action
Bind For each roster entry, resolve role → skill SKILL.md path, model tier, engine (per Orchestrator Detection), and spawn config
Verify prereqs Confirm the active hub's spawn tool + per-CLI prereqs (reference/execution-layers.md); for Codex packages check active spawn capability/capacity under _common/CODEX_ORCHESTRATION.md C1, for agy check the TTY/real-pty path (_common/CLI_COMPATIBILITY.md §9). If a §5 engine is unreachable, apply that package's fallback_engine (default claude-code) and log the substitution + its cost/throughput trade-off; hard-fail only when no fallback is defined
Sub-orchestrator setup Where §5 nominates Vision/Orbit/Rally, prepare its sub-hub contract (≤7 specialists each)
Pre-flight checklist Run the Charter §10 pre-flight checklist (Charter complete, owners constructable, engine prereqs/fallbacks, clean tree/branch, team-readiness); tick each item and log TEAM_BUILT
Dry-run check Validate that every §4 work package has a constructable owner; any unconstructable entry escalates before execution begins

Exit gate: every work package has a verified, spawnable owner. Unresolvable roster entries do not get improvised — enact reports the gap and recommends re-authoring via charter (§5). dry-run mode stops here and delivers the constructability report.

★ Confirm Gate

Team construction + full orchestration spawns the execution team and writes code (potentially many spawns + iterations + file writes). The gate sits at Phase 1 exit.

Mode Behavior
INTERACTIVE Always confirm; user may adjust before build
GUIDED Always confirm; approve / abort
AUTORUN Explicit Y/N; default abort on no response
AUTORUN_FULL Announce-and-proceed (no objection window) — the reference/recipe-contract.md §3 tier for runs-to-completion recipes where only §8 red lines stop. Print the construction summary (work-package count, roster size, estimated agent count / cost / time) and start immediately, because run-to-completion is the contract. Cost is pre-authorized by invoking enact.

dry-run never reaches execution regardless of mode. The Confirm Gate is the only gate at the start; it is not re-evaluated mid-run (run-to-completion).

Run-to-Completion Contract (enforced)

Under AUTORUN_FULL, enact is bound to finish what it starts. It removes every recoverable stop point and guarantees forward progress to a terminal state for each work package.

No-stop rules (recoverable conditions never halt the run):

  • Progress confirmations are suppressed. No "continue?" prompts between packages or phases. The single ★ Confirm Gate announce-and-proceeds.
  • Recoverable failures auto-recover and continue. Per package: retry (max 3) → fallback_engine (per §5) → recovery-chain injection (Scout RCA → Builder fix) → alternate owner skill. The run does not pause to ask.
  • A package that still cannot complete is marked SKIPPED(blocked) with reason, logged to §9, and the run continues with the remaining packages. One unsatisfiable package never aborts the whole run.
  • Cost does not pause the run. Enact proceeds to the Charter §8 budget ceiling automatically; only a genuine ceiling breach escalates, per §8 policy.
  • Interruptions auto-resume. On context limit / crash / harness restart, enact resumes from the run-log tail (as if resume) without asking. The run is "done" only at DELIVER.

Completion guarantee: Phase 2 loops until every §4 work package is in a terminal state — SUCCESS, PARTIAL, or SKIPPED(blocked, reason). BLOCKED is never a resting state: the recovery ladder above must be exhausted first. DELIVER reports the full per-package status set.

Safety red lines (the only intentional stops — NOT bypassed by run-to-completion):

  • Charter §8 human-confirm triggers: L4 security, destructive/irreversible data actions, external system modifications, and edits beyond the file scope §6 pre-authorized (e.g. 10+ files not covered by package ownership). These pause for confirmation even in force mode — run-to-completion pre-authorizes only what the Charter already scoped, not actions outside it.
  • No valid Charter (missing/invalid section, roster names a non-existent skill): a precondition failure, not a mid-run stop — enact reports and exits before execution.

Honesty red line: Run-to-completion ≠ faking green. §7 verification failures are reported truthfully with output; the run completes and DELIVERs with FAILED/PARTIAL statuses rather than masking, retrying forever, or bypassing checks (global quality rule). "Finish to the end" means reach a true terminal verdict, not a fabricated success.

Run Log (append-only)

The orchestrator maintains a single append-only run-log file and writes one line per progress event as the run unfolds. It is the crash-resilient audit trail and the source of truth for resume — never the orchestrator's in-context memory, which a long run outgrows.

File: default <charter_dir>/<charter_stem>.run.log.md (e.g. docs/CHARTER.md → docs/CHARTER.run.log.md); override with log=<path>. Durable and committable alongside the Charter. Each enact run appends a ## Run <n> — <charter_path> — started <ts> header, then its events; prior runs' lines are never rewritten.

Append rules:

  • Append-only. Only ever add lines at the end; never edit or delete existing lines. A partial log after a crash is still valid.
  • One line per event, written immediately as the event occurs (not batched at the end) so an interruption loses at most the in-flight line.
  • Line format: - [<ISO-8601 ts>] <EVENT> pkg=<id> status=<…> — <one-line note> (events with no package omit pkg=).
  • Flush at every boundary, then mirror a compact pointer into Charter §9 (last_event, run_log: <path>#<anchor>) so §9 stays small and the timeline stays in the log file.

Logged events (minimum):

Event When Key fields
RUN_START enact launches charter path, mode, package count, log path
TEAM_BUILT Phase 1 exit roster size, engines, fallbacks applied
CONFIRM ★ Gate announce-and-proceed / approved / rejected
PKG_START a package begins pkg id, owner skill, engine
PKG_RECOVER recovery-ladder step fires pkg id, step (retry/fallback/scout/alt-owner)
PKG_DONE a package reaches terminal pkg id, status (SUCCESS/PARTIAL/SKIPPED+reason)
SAFETY_STOP §8 red line hit trigger, awaiting-confirm / resolved
VERIFY §7 gate result gate, pass/fail + output ref
RESUME run restarts resumed-from event, packages skipped
RUN_END DELIVER overall status, per-package tally

Resume: on restart, read the run-log tail, treat the last PKG_DONE as the checkpoint, emit RESUME, and continue with packages not yet terminal. No re-confirmation, no re-running completed packages.

Phase 2: End-to-End Orchestration

Execute Charter §4 via the §6 Orchestration Plan. Standard Nexus EXECUTE → AGGREGATE machinery, parameterized by the Charter.

  • Spawn per work package in §4 order; pass only state deltas (reference/context-strategy.md). Independent packages run as parallel branches with file ownership from §6 (_common/PARALLEL.md); no shared mutable state.
  • Build loops (multi-iteration implementation packages) apply _common/PROJECT_LOCAL_SKILLS.md: delegate to project-local orbit when available; otherwise Nexus drives the same bounded build → judge → test → converge loop directly and records project_local_fallback: true, as in Apex Phase 6. Engine per Charter §5 (Codex CLI for high-volume coding loops where available). On the local path, Orbit drives these Charter-natively — it receives the read-only §4/§5/§7/§10 slice, uses the §10 per-package DoD as its external DONE gate, and appends PKG_* events to the same §9 run-log (.claude/skills/orbit/reference/charter-loop-driver.md). The selected loop driver owns the single package's loop; enact retains cross-package sequencing and aggregation (hub-spoke).
  • Guardrails L1-L4 + checkpoint-resume on 4+ step chains; max-hop limit enforced; destructive/L4/out-of-scope actions pause per §3/§8 (safety red line). The circuit breaker after 3 consecutive package failures does not abort the run — it marks that package SKIPPED(blocked) and moves on (run-to-completion).
  • Run-to-completion recovery: a failing package walks the recovery ladder (§ Run-to-Completion Contract) before being skipped; the run never pauses to ask on recoverable failures.
  • Aggregate branch outputs hub-spoke; validate schema + semantic correctness at each boundary.
  • Definition of Done. A package is SUCCESS only when its Charter §10 per-package DoD checklist fully passes (AC met + tests green + lint/build/typecheck + review); partial pass → PARTIAL, unrecoverable → SKIPPED. DoD is the objective terminal-state criterion, not prose judgment.
  • Append one run-log line per event (PKG_START / PKG_RECOVER / PKG_DONE / SAFETY_STOP …) the moment it occurs; at PKG_DONE also tick that package's row in the §10 progress tracker. Mirror a compact pointer into Charter §9, so an interrupted run auto-resumes from the run-log tail (see Run Log).

Exit gate: every work package is in a terminal state — SUCCESS / PARTIAL / SKIPPED(blocked, reason); none left pending or merely BLOCKED. Outputs aggregated; skipped packages carry unblock conditions in §9.

Phase 3: Verify & Deliver

Agent Role Required
radar Fill test gaps / run the verification suite per §7 Conditional: code changed
judge Final review of aggregated changes Conditional: code changed
guardian Commit policy, branch strategy, PR preparation Yes (if code changed)
launch Release/rollback plan Conditional: release in scope

Run §7 gates (tests/build/security/AC), appending a VERIFY line per gate and a final RUN_END line to the run log. Then work the Charter §10 final delivery checklist (all gates pass, no release-critical SKIPPED, run-log RUN_END written, rollback ready) — each unticked item is surfaced in DELIVER, not silently passed. Update the Charter (§9 summary/pointer + §4 AC status + §10 tracker/checklist ticks) so the delivered document reflects what was actually done — the living Charter. DELIVER returns NEXUS_COMPLETE with the Charter path, run-log path, per-package status, the completed §10 checklists, verification results, and follow-ups.

Exit gate: §7 verification passes (or failures surfaced honestly with output, per global quality rules); Charter persisted and current.

Conditional Inclusion

Condition Add Skip
dry-run — ★ Confirm, Phase 2, Phase 3
resume — packages already terminal in the run-log tail
No code changes (docs/plan-only Charter) — radar, judge, guardian, launch
Work cluster needs hierarchy (per §5) Vision/Orbit/Rally sub-orchestrator —
Release in scope (per §7/§8) launch —

AUTORUN Chain Template

Nexus AUTORUN enact docs/CHARTER.md
  ── read Charter ─────────────────────────────────────
  → parse docs/CHARTER.md (+ CHARTER.roster.yaml if present)
  → validate required sections (§3-§8, §10); missing/invalid → stop + report gap
  → open run log docs/CHARTER.run.log.md (append "## Run <n>" + RUN_START)
  ── Phase 1 Team Construction ────────────────────────
  → for each §5 roster entry: bind(role→skill→spawn) + verify prereqs
  → run §10 pre-flight checklist (tick all) → sub-orch setup? → dry-run check
     (enact dry-run → STOP + deliver constructability report)
  ── ★ Confirm Gate ───────────────────────────────────
  → AUTORUN_FULL: announce construction summary → proceed immediately (no wait)
  ── Phase 2 End-to-End Orchestration (run to completion) ─
  → loop until every §4 package is terminal (SUCCESS|PARTIAL|SKIPPED):
       spawn(owner_skill, contract=package.AC, model=§5.tier, engine=§5.engine)
       ‖ parallel branches with §6 file ownership
       build-loop packages → orbit(sub-orchestrator)
       terminal = §10 per-package DoD checklist result (SUCCESS|PARTIAL|SKIPPED)
       append run-log: PKG_START → PKG_RECOVER* → PKG_DONE (immediately)
         → tick §10 progress-tracker row at PKG_DONE
       on recoverable failure: walk the recovery ladder (§ Run-to-Completion Contract)
         → still failing: mark SKIPPED(blocked, reason), CONTINUE (no abort)
       on safety red line (L4/destructive/out-of-scope per §8): pause + confirm
       on interruption: auto-resume from run-log tail
       mirror §9 pointer per package boundary
  → aggregate hub-spoke
  ── Phase 3 Verify & Deliver ─────────────────────────
  → radar? + judge? → §7 gates (tests/build/sec/AC); append VERIFY lines
  → work §10 final delivery checklist (unticked items surfaced in DELIVER)
  → guardian(commit/PR)? → launch(release)?
  → append RUN_END; update Charter (§9 pointer + AC status + §10 ticks)
  → NEXUS_COMPLETE(charter_path, run_log_path, checklists, statuses)

Termination Bound

N/A for a convergence loop — see § Run-to-Completion Contract → Completion guarantee for the per-package terminal-state bound that governs when enact stops.

Scale

Charter-dependent: typically 15-50 agents across all work packages, single pass per package, high cost. The Charter's package count is the multiplier; dry-run mode costs 2-4 agents (constructability check only).

Output Report — Execution Report (named)

Emitted inside NEXUS_COMPLETE on top of the base ## Nexus Execution Report:

  • Charter provenance — which Charter drove the run and its §10 pre-flight checklist result
  • Per-package disposition — every work package with its owner, terminal status (DONE / FAILED / PARTIAL / SKIPPED), and verification output reference
  • Run log tail — the append-only event sequence (PKG_START / PKG_RECOVER / PKG_DONE / SAFETY_STOP …) that also serves as the resume state
  • Constructability gaps — roster entries that could not be resolved to a spawnable owner, with the charter re-authoring recommendation
  • Truthful verification result — §7 gate outcomes reported with output; a FAILED package is reported as FAILED, never masked (§8 honesty red line)

Failure Escalation

Merges the operational trigger/escalation view with the failure-mode rationale (what goes wrong without the rule) — one table, no second index; this section is enact's reference/recipe-contract.md §1 element 5. Under run-to-completion, only precondition and safety red line failures stop the run; every recoverable failure continues. The design goal is forward progress to a true terminal verdict — never an early stop, never a faked green.

Failure / anti-pattern Detected by Escalation (run-to-completion)
Charter missing/invalid section — improvising past a bad Charter enact parse Stop (precondition) — report which section; recommend charter to re-author. A missing section is never silently patched
§5 roster names a non-existent skill enact bind Stop (precondition) at Phase 1; report the gap; do not improvise an owner
Phase 1 engine prereq unmet (e.g. Codex rejects the planned child depth) — an engine outage hard-failing the run Nexus Continue — apply package fallback_engine (default claude-code; log substitution + cost/throughput trade-off); hard-fail only that package when no fallback is defined
Phase 2 package repeat failure — stalling on a recoverable failure, or one blocked package aborting an otherwise-complete delivery judge/radar Continue — walk the recovery ladder (§ Run-to-Completion Contract) without asking; if still failing, mark SKIPPED(blocked, reason) + log §9 and proceed to remaining packages. The 3-failure circuit breaker skips that package, never aborts the run
Build loop stuck / over budget — spend prompts interrupting an authorized run orbit Continue — orbit switches strategy and keeps going; spend proceeds to the Charter §8 budget ceiling automatically, and only a genuine ceiling breach escalates per §8
Interruption (crash / context limit / harness restart) — progress lost, run restarts from scratch harness Continue — auto-resume from the append-only run-log tail (last PKG_DONE is the checkpoint); terminal packages skipped, no re-confirmation
Safety red line (L4 / destructive / out-of-scope per §8) — force mode acting outside the Charter's scope Nexus / §8 Stop + confirm — the one intentional mid-run pause, not bypassed by run-to-completion (which pre-authorizes only what the Charter already scoped); resumes on approval, aborts only that action on denial
§7 verification fails — run-to-completion misread as "report success regardless" radar/judge Continue to DELIVER — report honestly with output; deliver FAILED/PARTIAL status; do not mask, retry forever, or bypass checks (global quality rule)

Boundaries / vs neighbors

Enact is the execution half of the charter → enact pair — it runs a document, it does not author one. How it differs from its siblings:

vs neighbor Enact The neighbor
charter Executes the Charter: constructs the team from §5, orchestrates §4 end-to-end, ships Authors the Charter (analysis + team design) — stops at the document, spawns no execution agents
apex Charter-driven, multi-package: runs a pre-authored roster of work packages to completion (no discovery) Self-contained single-feature discovery→ship: picks its own goal, specs, designs, builds, ships one feature in one chain
summit Drives every §4 package to a terminal state; one owner per package (no competition) Quality-max tournament — multiple candidate solutions compete on one problem, judged to a winner

Decision tree: have a Charter (from charter or hand-written) and want it run end-to-end → enact. Need the Charter authored first → charter. One high-stakes feature, discovery→ship, no Charter → apex. Quality-max with competing candidates → summit.

Cost and Latency Profile

Profile Phases active Approx agent count Approx cost
dry-run 1 per §5 roster size (no execution) Low
small Charter (no build loops) 1, 2, 3 6-12 Medium
standard Charter (1-2 build loops) All 12-20 Medium-High
large Charter (multiple build loops + sub-orchestrators) All + orbit loops + Vision/Rally 20-30+ High

Enact is the expensive half of the pair; the ★ Confirm Gate, 5+-agent chain confirmation, orbit cost-per-task tracking, and L4 gates bound spend. Because the team is reconstructed from the Charter, enact can be re-run (or resumed) without re-paying for analysis/authoring.


Visualization

See § Topology for the phase flow. Enact consumes docs/CHARTER.md (+ CHARTER.roster.yaml), streams every progress event to the append-only run log docs/CHARTER.run.log.md, and writes back the Charter §9 pointer/summary; the Charter stays the single source of truth and the run log is the auditable, resumable timeline.

Source: SKILL.md on GitHub

3 warnings13d5 checks · Risk MEDIUM
  • Gen Agent Trust Hub13d

    The 'nexus' skill is a comprehensive multi-agent orchestration framework that manages complex task chains. While it incorporates extensive internal guardrails and verification protocols, it explicitly mandates the use of high-risk flags that bypass security permissions to achieve autonomy. It also provides instructions for establishing persistent tasks via cron and GitHub Actions, and utilizes external research tools to fetch content from the web.

  • Socket13d

    1 alert: gptSecurity

  • Snyk13d

    Risk: LOW · No issues

  • Runlayer6mo

    6/22 files flagged

  • ZeroLeaks5mo

    Score: 93/100 · 2 sections analyzed

Signed by skilld at c805268. This ties the file your Agent reads to that commit on GitHub. It does not review the instructions.

Last checked against GitHub 2 days ago.

Activeupdated 2 weeks ago

README badge

README badge for simota/agent-skills/nexus